FIELD: electricity.
SUBSTANCE: installation for conversion of roll and pitch energy of the going vessel comprises a body of anticorrosive material with ratchet mechanisms arranged in parallel to its sides, one end of the mechanisms is placed in the rear part of the installation while the second is in the front part and is fixed to the cylinder-shaped shaft. Both ends are interconnected by a circuit connected to side outputs of a rectangular tank placed inside the installation. On the top of the tank there are a front and rear handles. Wheels of the tank are placed at the rails fixed to the installation bottom. Between rails in the front and rear part of the installation there are spring-type brake systems consisting of a heel and a spring. At the installation top part, from inwards, at both sides there are gripping mechanisms, which consist of a latch hook, a lock and spring.
EFFECT: simplification of the installation design, reduction of manufacturing costs.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
AERODYNAMIC AIRCRAFT | 2015 |
|
RU2609577C1 |
AERODYNAMIC VESSEL | 2019 |
|
RU2710040C1 |
AERODYNAMIC VESSEL | 1999 |
|
RU2149109C1 |
STREAMLINED SHIP | 2013 |
|
RU2538484C1 |
PITCH-DRIVEN SHIP AND PITCH DRIVE PROPULSOR | 2008 |
|
RU2392177C1 |
METHOD OF TRANSFORMATION OF OSCILLATION MOTION ENERGY OF FLOATING CRAFT | 1989 |
|
RU2046994C1 |
ICE-BREAKING SYSTEM FOR FLOATING BODIES | 2009 |
|
RU2483967C2 |
KREINDLIN'S DEVICE FOR THE MOVEMENT OF PEOPLE WITH A VIOLATION OF THE MUSCULOSKELETAL SYSTEM | 2022 |
|
RU2783556C1 |
SHIP DRIVEN BY HULL PITCHING ENERGY | 2006 |
|
RU2365520C2 |
SET FOR TESTING MARINE PROPULSION PLANT | 0 |
|
SU1699858A1 |
Authors
Dates
2014-12-27—Published
2013-07-18—Filed