FIELD: oil-and-gas industry.
SUBSTANCE: invention relates to the oil-and-gas industry and can be used for the development of hard-to-extract gas deposits. The proposed method comprises drilling of the main wellbore, running-in of a production string, surveying, drilling of a horizontal section in a productive formation. Note here that the said main wellbore is drilled with a preset inclination angle, encased by the production string with a precut opening in an aluminium shell for drilling and finishing of a smaller-diameter lateral borehole. The wellbore production sections are drilled gently sloping and equipped with appropriate filters. Simultaneously, a dual production string is run-into the main and lateral horizons to be isolated by a packer above the roof of the lower productive horizon to develop separately the horizons by separate production strings. In the well operation, methanol is fed automatically at a preset flow rate in the main wellbore annulus and lateral borehole annulus.
EFFECT: higher efficiency of development.
2 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS | 2014 | 
 | RU2560763C1 | 
| METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 | 
 | RU2594235C2 | 
| METHOD FOR DETERMINING SIDETRACKING TRAJECTORY TAKING INTO ACCOUNT GEOLOGICAL RISKS | 2024 | 
 | RU2840932C1 | 
| METHOD FOR WELL DRILLING AND DEVELOPMENT OF MULTIHORIZON HYDROCARBON FIELD CHARACTERIZED BY NON-UNIFORM GEOLOGICAL CONDITIONS OF PRODUCTIVE BED ATTITUDES | 2006 | 
 | RU2295632C1 | 
| METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 | 
 | RU2740884C1 | 
| DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 | 
 | RU2743478C1 | 
| METHOD FOR OIL PRODUCTION FROM FORMATION WITH ABNORMALLY LOW FORMATION PRESSURE | 2012 | 
 | RU2501940C1 | 
| METHOD OF MULTILAY FIELD DEVELOPMENT | 2012 | 
 | RU2505667C1 | 
| METHOD OF DEVELOPMENT OF MULTIHORIZONT OIL POOL | 2002 | 
 | RU2213854C1 | 
| METHOD FOR EXTRACTION OF CONVENTIONAL AND HYDRATED GAS OF MULTI-FORMATION DEPOSIT AND DEVICE FOR ITS IMPLEMENTATION | 2023 | 
 | RU2819884C1 | 
Authors
Dates
2014-12-27—Published
2013-07-24—Filed