FIELD: mining.
SUBSTANCE: invention relates to mining industry and can be used at formation and stabilisation of ore quality at a stage of mining operations. The method involves determination of coordinates of a bucket of a mining unit, content of a useful component in the mined rock in the bucket of the mining unit as a conditional mathematical expectation of content of the useful component at an excavation point, which is determined as per results of preliminary testing of a network of wells in vicinity of the excavation point with determined coordinates, loading of the transport vehicle and its addressing to unloading sites considering content of the useful component in the transported mined rock. Depending on position of the mining unit in relation to location zones of technological sorts of the mined rock in a working face, a possibility is established and a task is created for predominant excavation of a certain technological sort at loading of the transport vehicle, in compliance with which positioning of the bucket of the extraction unit is performed in the working face at excavation; besides, mining-out of the rocks of the working face is started from an outline between technological types of the mined rock, the position of which and location zone of technological types is specified by geophysical methods during excavation as per the analysis data of the mined rock in the bucket of the mining unit.
EFFECT: improving parameters of quality and excavation of technological sorts of ores and mined rock for ore sorting.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONTROL OF LORRIES IN OPEN PITS DURING SELECTIVE ORE EXTRACTION AND SYSTEM FOR AUTOMATIC CONTROL OF ORE DELIVERY BY MEANS OF EXCAVATOR-LORRY COMPLEX | 1996 |
|
RU2100844C1 |
METHOD OF SELECTIVE EXCAVATION OF ORE MINERALS | 0 |
|
SU1133400A1 |
GENERATION OF DYNAMIC FORCES IN EXCAVATOR MECHANISM | 2012 |
|
RU2521625C2 |
DRILLING-AND-BLASTING JOBS | 2012 |
|
RU2521629C2 |
STRIP MINING OF MINERALS INCLUDING WORKING OF ORE BODIES IN CONTACT BETWEEN ORE AND CAPPING IN SUB-BENCHES | 2013 |
|
RU2524716C1 |
METHOD FOR ZONING OF EXCAVATING BOTTOMS TO CONTROL OPERATION OF EXCAVATOR-CAR COMPLEXES | 2020 |
|
RU2738919C1 |
METHOD OF SEPARATION OF MINED BULK INTO METALLIC AND NONMETALLIC PARTS AND DEVICE FOR ITS EMBODIMENT | 1996 |
|
RU2101094C1 |
METHOD OF ORE QUALITY FORMATION | 0 |
|
SU1703816A1 |
DEFINITION METHOD OF CONTENT OF EFFECTIVE COMPONENT IN IMPLODED MOUNTAIN MASS AT ITS EXCAVATION AT MOTIONS | 2008 |
|
RU2386032C1 |
METHOD FOR DIFFERENTIATED AUTOMATED LOADING OF MINED ROCK INTO DUMP-TRUCKS DURING CONTINUOUS OPERATION OF EXTRACTION UNIT AND AUTOMATED SYSTEM FOR REALISING SAID METHOD | 2015 |
|
RU2595115C1 |
Authors
Dates
2015-01-10—Published
2013-03-12—Filed