FIELD: metallurgy.
SUBSTANCE: device for precious metals leaching includes a conic reactor with a lid, junction pipes for inlet and outlet of a reaction mixture, a node for force circulation consisting of a pump and connecting pipes. The node for force circulation is provided with an ejector connected to the lower part of the conic reactor. At that the ejector nozzle is connected to the outlet of the circulating pump, the ejector suction chamber is designed with a channel connecting it to an internal volume of the reactor, and the ejector diffuser is connected to a junction pipe of the reaction mixture inlet to the reactor. The junction pipe of the reaction mixture inlet is located tangentially in an upper part of the reactor, and the junction pipe of the reaction mixture outlet is located in the centre of the reactor lid, it is submerged in the reaction mixture and is connected to the circulating pump inlet.
EFFECT: increasing the speed of precious metals leaching.
1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR LEACHING | 2013 |
|
RU2526350C1 |
LEACHING DEVICE | 2010 |
|
RU2439174C2 |
METHOD OF DEVICE FOR LEACHING RICH GOLD-BEARING CONCENTRATES | 1999 |
|
RU2168555C2 |
METHOD AND DEVICE FOR CYANIC LEACHING OF NOBLE METALS FROM ORES, CONCENTRATES, TECHNOGENIC AND MINERAL WASTES | 1996 |
|
RU2087697C1 |
LINE FOR PROCESSING GOLD-CONTAINING FLOTATION CONCENTRATES | 1994 |
|
RU2062797C1 |
PROCESSING LINE OF GOLD-SILVER ORE GRAVITY CONCENTRATION PRODUCTS | 1991 |
|
RU2022040C1 |
PLANT FOR GOLD EXTRACTION FROM ORES AND CONCENTRATES | 2013 |
|
RU2522873C1 |
INSTALLATION TO LEACH NOBLE METALS | 1993 |
|
RU2098494C1 |
INSTALLATION FOR LEACHING OF NOBLE METALS | 1991 |
|
RU2027786C1 |
METHOD OF LEACHING OF METALS FROM ORES AND GEAR FOR ITS IMPLEMENTATION | 1993 |
|
RU2061066C1 |
Authors
Dates
2015-01-10—Published
2013-07-18—Filed