FIELD: mining.
SUBSTANCE: proposed method comprises removal of covering access rock at blast loosening by charges with air cushion in the charge lower end, mechanical loosening and push loading of rock, its piling and loading by excavator into carriers. Blast holes for access rock are drilled in mineral formation to the depth of air cushion at the charge bottom end. Single blasting is performed in well-by-well manner by the system of nonelectric initiation. Every second or third blast well is drilled in mineral formation of decreased hardness.
EFFECT: higher efficiency of destruction, power saving at mineral loosening.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
OPEN DEVELOPMENT METHOD OF COAL BEDS GROUP WITH GROSS EXPLOSIVE LOOSENING OF OVERBURDEN ROCKS | 2015 |
|
RU2593285C1 |
METHOD FOR OPENCAST MINING BLANKET DEPOSITS | 2002 |
|
RU2235205C2 |
VARIABLE-DIAMETER BOREHOLE CHARGE FOR LOOSENING OF ROCKS | 2014 |
|
RU2572260C1 |
METHOD FOR OPENED BEDDED DEPOSIT DEVELOPMENT | 2005 |
|
RU2303695C1 |
METHOD FOR CYCLIC-CONTINUOUS MINING OF ROCKS | 2020 |
|
RU2741649C1 |
METHOD FOR EXTRACTING HARD MINERAL RESOURCES DEPOSITS | 2002 |
|
RU2236592C2 |
DEVELOPMENT METHOD OF KIMBERLITE DEPOSITS | 2008 |
|
RU2384706C1 |
METHOD MINING OF HEAR MINERAL DEPOSITS | 2000 |
|
RU2181834C2 |
METHOD OF DEVELOPMENT OF LOCAL AREAS OF MINERALIZATION IN STRONG ROCKS | 2019 |
|
RU2723419C1 |
METHOD FOR OPENCAST MINING OF LUMPY AND SANDY-ARGILLACEOUS ROCKS | 1992 |
|
RU2039268C1 |
Authors
Dates
2015-01-10—Published
2013-12-10—Filed