FIELD: mining.
SUBSTANCE: proposed process comprises breaking of rock by combine, loading of the into self-propelled car, its transfer from working zone scraper conveyor, transfer to ore-pass well and discharge to main conveyor. Scraper conveyors are arranged in parallel nearby each other. Note here that conveyor unloading fights are arranged above ore-pass wells while conveyors are timed. Quantity of parallel conveyors allows the width of discharge surface for locating of crushed ore without fall on working soil.
EFFECT: higher efficiency of combine working.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CHAMBER MINING WHEN PREPARING HORIZONS | 2016 |
|
RU2627803C1 |
MINERAL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2501949C1 |
METHOD FOR DEVELOPMENT OF FLAT BEDS OF POTASSIUM SALTS BY COMBINE COMPLEXES | 2024 |
|
RU2817486C1 |
METHOD FOR DEVELOPMENT OF GENTLY SLOPING FORMATIONS OF POTASSIUM SALTS BY COMBINE MACHINES | 2019 |
|
RU2720863C1 |
TREATMENT OF POTASH SEAMS | 2013 |
|
RU2538016C1 |
METHOD OF PREPARATION AND DEVELOPMENT OF EXTRACTION UNIT BY DIAGONAL CHAMBERS | 2019 |
|
RU2709266C1 |
PROCESSING OF POTASSIC SEAMS BY COMBINED TECHNOLOGY | 2013 |
|
RU2524093C1 |
METHOD FOR MINING OF MINERAL GENTLY DIPPING SEAMS BY COMBINE COMPLEXES | 1992 |
|
RU2036306C1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
Authors
Dates
2015-01-10—Published
2013-11-22—Filed