FIELD: mining.
SUBSTANCE: step-by-step mining of productive layers of potassic seams with advance breaking the rock salt, first shearer mining is executed in the chamber design contour over its entire length to combine it with vent drift. Blasting cutting of the entire rock salt is performed in the entire volume of cleanup chamber design contour from the walls of shearer mining drift. Cut rock salt if placed on soil of previous shearer mining. Excavation of mineral from productive layers of potassic seam is performed by heading machine. Machine drift in the chamber design contour is located subject to chamber width either at the chamber centre or on board of its design contour.
EFFECT: higher efficiency of seam working owing to complete cutting of diluting layer in chamber contour.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESSING OF POTASSIC SEAMS | 2013 |
|
RU2524084C1 |
TREATMENT OF POTASH SEAMS | 2013 |
|
RU2538016C1 |
METHOD TO DEVELOP STRONG SLOPING POTASSIUM BED WITH LAYER OF MINE SALT | 2010 |
|
RU2439322C1 |
METHOD FOR MINING THICK SALT OUTBURST-PRONE SEAMS WITH COMPLICATED HYPSOMETRY OF THEIR OCCURRENCE | 1991 |
|
RU2015329C1 |
DEVELOPMENT METHOD OF GENTLY SLOPING POTASSIUM BEDS | 2010 |
|
RU2435957C1 |
METHOD OF DEVELOPMENT OF THICK SLOPING POTASSIUM BED WITH ROCK SALT INTERBED | 2009 |
|
RU2421616C1 |
DEVELOPMENT OF THICK FLAT-LYING POTASH BEDS | 2014 |
|
RU2567576C1 |
METHOD FOR LARGE CHAMBER CUTTING IN HORIZONTAL LAYERS | 2006 |
|
RU2309252C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD OF BLOCK PREPARATION AND PRIFILING OF THE CONTIGUOUS FLAT SYLVINITE LAYERS BY CHAMBERS | 2014 |
|
RU2552270C1 |
Authors
Dates
2014-07-27—Published
2013-05-27—Filed