FIELD: oil and gas industry.
SUBSTANCE: production platform (1) is suggested with potential connection of branch connection coupled to a production manifold (10) in order to ensure connectivity to the production manifold (10) of at least two production connection strips from the respective subsea wellhead equipment. The production platform is made as a retrofitted module capable to be connected to a single inner tube (11) placed in the production manifold (10). The production platform comprises a frame (2), a pipeline (3), at least one connector (4) and rails (9). The frame (2) is made so that it may be placed on a support device (12). The support device (12) passes from the production manifold (10). The pipeline (3) forms a branching ended by a connector (4) and by at least two external tubes (6).
EFFECT: connection of two production strips to the manifold and reduction of boring rig time in the well.
9 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
UNDERWATER DEVICE (VERSIONS) AND PROCEDURE FOR TRANSPORTING WELL FLUID | 2007 |
|
RU2416712C2 |
METHOD FOR OPERATION OF UNDERWATER GAS AND GAS CONDENSATE FIELD AND UNDERWATER EJECTOR FOR ITS IMPLEMENTATION | 2022 |
|
RU2788253C1 |
UNDERWATER MODULE | 1997 |
|
RU2186932C2 |
METHOD OF CONSTRUCTION AND TECHNOLOGICAL COMPLEX OF UNDERWATER MINERAL MINING | 1998 |
|
RU2140516C1 |
PIPES CONNECTION DEVICE | 2008 |
|
RU2499939C2 |
UNDERWATER DRILLING RIG AND SUPPORTING PLATFORM FOR IT | 1995 |
|
RU2081289C1 |
UNDERWATER RIG FOR DEVELOPMENT OF HYDROCARBONS (OIL AND GAS) DEPOSITS IN ARCTIC SHELF | 2012 |
|
RU2507382C1 |
SYSTEM AND METHOD FOR SHUT-OFF VALVES CLOSING OF UNDERWATER GAS FIELD | 2022 |
|
RU2783981C1 |
APPARATUS FOR ATTENDING UNDERWATER WELLS | 0 |
|
SU908254A3 |
UNDERWATER PUMP SYSTEM | 2009 |
|
RU2500925C2 |
Authors
Dates
2015-02-10—Published
2010-09-24—Filed