FIELD: oil and gas industry.
SUBSTANCE: method includes measurement of gas loss, installation of flow line for the purpose of gas blowing at a safe distance from the well, cleaning of welding spot, imposition of a welding seam, performance of visual, measurement, X-ray and ultrasound testing of the welded seam, dismounting of the flow line, checking non-availability of gas losses in the welded seam area.
EFFECT: improved hermetic sealing for threaded connection of director clutch and tubing head installation tube at the well without overhauling.
2 cl, 2 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD FOR ELIMINATION OF INTERNAL GAS SHOWINGS IN WELL | 2008 | 
									
  | 
                RU2373377C1 | 
| METHOD FOR ELIMINATION OF LEAKAGE OF STRINGS OF OIL AND GAS WELLS | 2014 | 
									
  | 
                RU2586360C1 | 
| DEVICE FOR SEALING THE INTERCOLUMN SPACE OF THE WELL HEAD BETWEEN THE CONDUCTOR AND THE TECHNICAL COLUMN | 2022 | 
									
  | 
                RU2775209C1 | 
| METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION | 2016 | 
									
  | 
                RU2614998C1 | 
| ABANDONMENT METHOD OF OIL-AND-GAS WELL LOCATED IN WATER AREA OF SHALLOW WATER RESERVOIR | 2009 | 
									
  | 
                RU2418152C1 | 
| WELLHEAD SPLIT SEALER | 2013 | 
									
  | 
                RU2531667C1 | 
| METHOD OF PHYSICAL ABANDONMENT OF WELLS | 2014 | 
									
  | 
                RU2576422C1 | 
| COLUMN HEAD FOR WELL MOUTH PRESSURIZATION | 2003 | 
									
  | 
                RU2254440C1 | 
| METHOD FOR PREPARATION OF DOWNHOLE EQUIPMENT FOR REPAIR AND/OR RECOVERY OPERATIONS ON WELL UNDER PRESSURE | 2024 | 
									
  | 
                RU2837577C1 | 
| METHOD OF WELL HEAD CONDUCTOR OR EXTENSION PIPE PART AIR-TIGHTNESS DETERMINATION IN PRODUCTION GAS WELL | 2004 | 
									
  | 
                RU2278257C1 | 
Authors
Dates
2015-02-10—Published
2014-01-21—Filed