FIELD: construction.
SUBSTANCE: method to install an arch consists in preliminary installation of binding beams, installation of temporary supports of alternating height onto them and serial assembly of arch elements with support against temporary supports. Additional temporary supports of alternating height are mounted on the binding beam at the low level, two side half-arches are assembled on them without support areas, as well as the middle part of the arch, from arch elements Then two side half-arches are hingedly fixed to the middle part of the arch, forming a hinged branch of the arch, afterwards weight-lifting devices are mounted on temporary supports, the hinged branch of the arch is rested on them in a hinged manner, and with the help of weight-lifting devices it is raised to the design height. After installation of support areas and combination of the binding beam and the arch with the help of arch filling the temporary supports are dismantled.
EFFECT: reduced labour costs in arch installation.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DISASSEMBLY OF ARCH BRIDGE | 2022 |
|
RU2800582C1 |
ARC ROOF | 0 |
|
SU1294944A1 |
WOODEN THREE-HINGED ARCH | 0 |
|
SU1742436A1 |
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT | 1999 |
|
RU2152477C1 |
METHOD FOR ERECTION OF PEDESTRIAN OVERPASS | 1999 |
|
RU2152475C1 |
0 |
|
SU94963A1 | |
ARCH-TYPE DECK BRIDGE AND METHOD FOR ITS MANUFACTURE | 2000 |
|
RU2171330C1 |
BENT-LAMINATE WOODEN CELLULAR CASING FORMED BY CROSS ARCHED STRUCTURES | 2014 |
|
RU2578063C2 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
DEVICE FOR ASSEMBLING ARC STRUCTURES | 0 |
|
SU1733599A1 |
Authors
Dates
2015-02-10—Published
2013-09-18—Filed