FIELD: bridge engineering. SUBSTANCE: bridge has foundation, arch structure made of semi-arch blocks with fastening members on foundation and embedding items, above-the-arch structure made in the form of ring walls, and ground backing. Novelty is that each block of semi-arches is made for its turn and fixation in the process of mounting relative to foundation which is provided with stop; internal lower ledge of semi-arch block engageable with foundation is made in the form of cylindrical surface; mounting clearance is provided in lock part of semi-arches whose ends are spigoted in position. Novelty is that before final joining of semi-arch blocks to foundation their ends are brought at spigoted joint to design value by turning semi-arch block on cylindrical surface of its lower ledge followed by bolting semi-arch abutment to foundation bracket, aligning semi-arch block ends at spigoted joint of overhead mounting cross-piece, and fixing semi-arch block ends together at spigoted joint. EFFECT: reduced labor consumption; enhanced precision of bridge mounting. 17 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
ARCH BRIDGE WITH TRAFFIC ON TOP | 2000 |
|
RU2167975C1 |
BRIDGE AND METHOD OF ITS BUILDING | 2004 |
|
RU2257442C1 |
ARCH-TYPE FILLED BRIDGE | 1997 |
|
RU2107770C1 |
ARCH-TYPE FILLED BRIDGE | 2003 |
|
RU2236498C1 |
JOINT METHOD TO CONNECT BRIDGE SPAN STRUCTURE BLOCKS | 2004 |
|
RU2284388C2 |
METHOD OF MOUNTING ARCHED TOP ROAD BRIDGE | 0 |
|
SU639989A1 |
METHOD TO INSTALL ARCH | 2013 |
|
RU2541010C1 |
GROUND FILLING BRIDGE | 2023 |
|
RU2822619C1 |
METHOD FOR BEAM BRIDGE RECONSTRUCTION | 2005 |
|
RU2302491C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
Authors
Dates
2001-07-27—Published
2000-07-04—Filed