FIELD: machine building.
SUBSTANCE: invention relates to pipeline transport. Test range contains connected pump station, metering-regulating station, process pipelines with shutoff valves, pipelines pig launchers/receivers, first, second and third ring pipelines with different diameters, work fluid tank, secondary electric pump units, drain and secondary pipelines. Along the first, second and third ring pipelines the artificial defects, and different obstacles are made: restrictions, gate valves, tees, branches with different radius, welded ring butt joints, and butt joints using backing rings.
EFFECT: possibility of calibration and certification of pigs, check of compliance between device readings and actual defect size.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
TEST GROUND PIPELINE WITH ASSEMBLY OF INTAKE/START/PASSAGE OF PIPELINE CLEANING AND DIAGNOSTICS MEANS | 2012 |
|
RU2547047C2 |
TESTING OF IN-PIPE INSPECTION INSTRUMENT AT CIRCULAR PIPELINE SITE | 2012 |
|
RU2526579C2 |
METROLOGICAL GROUND | 2016 |
|
RU2641618C1 |
TEST STAND FOR HIGH PRESSURE HYDRAULIC DRIVES OF RECTILINEAR RECIPROCATING MOTION | 2021 |
|
RU2755376C1 |
AUTOMATED CLEANING DEVICE STARTING CHAMBER | 2018 |
|
RU2690111C1 |
REFUELLING TRUCK | 1997 |
|
RU2113367C1 |
OIL EXTRACTION METHOD | 2008 |
|
RU2367777C1 |
GAS EXTRACTION METHOD | 2008 |
|
RU2367776C1 |
RECOVERY METHOD OF GAS CONDENSATE | 2008 |
|
RU2367781C1 |
METHOD OF CONTROLLING OIL FIELD | 2008 |
|
RU2367785C1 |
Authors
Dates
2015-04-27—Published
2012-07-18—Filed