FIELD: construction.
SUBSTANCE: worn surfaces 2, 3 and 4 of an ice road flexural bowl 5 are cleaned. Snow banks 7 are formed on side snow-collecting strips 6. Snow mass from formed banks 7 is thrown at the worn surface of the ice road 5. Water is delivered and supplied from wells 11 into water trucks 12 and to a milling device 10. Worn surfaces 2, 3 and 4 of the road flexural bowl 5 are cleaned by milling of side surfaces and the bottom of the shaped channel 13 with simultaneous addition of water into cut and thrown snow mass until condition of supersaturation. Additionally snow mass is thrown from side snow-collecting strips 6, the laid material is levelled and compacted.
EFFECT: increased efficiency of a process of ice road repair within short periods of time.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR REPAIRING WINTER SNOW ROAD | 2013 |
|
RU2530966C1 |
METHOD TO CONTROL HEAT INSULATION OF SWAMP BEDS OF ICE ROADS BEFORE FLATTENING | 2012 |
|
RU2488657C1 |
METHOD FOR REPAIR OF ROAD SURFACE | 2012 |
|
RU2506366C2 |
DEVICE TO FORM TRACK STRIPS IN REPAIR OF MOTOR ROADS | 2012 |
|
RU2500851C1 |
METHOD OF BUILDING TEMPORARY SNOW-AND-ICE COVERING AND TRAILING THERMAL CUTTING SNOW-COMPACTING PLANT | 2004 |
|
RU2252290C1 |
STEEPED TRACK STRIP FORMING DEVICE | 2003 |
|
RU2244061C1 |
SNOW-COMPACTING PLANT | 2020 |
|
RU2740987C1 |
DEVICE FOR TIGHTENING OF SNOW DUMPS OF ROADWAY | 2006 |
|
RU2327005C1 |
DEVICE FOR PREPARATION OF FOUNDATIONS OF ICE ROADS ON DRIED SWAMPS | 2012 |
|
RU2487210C1 |
COMBINED MACHINE FOR SNOW EMBANKMENT COMPACTION | 2006 |
|
RU2321700C1 |
Authors
Dates
2015-05-10—Published
2013-12-18—Filed