FIELD: construction.
SUBSTANCE: method to produce root piles is realised with a small-size drilling rig, in the feed unit of which a pneumodrill in a jacket is installed. The pneumodrill is connected with drilling-casing pipes, in the lower part of which via an adapter they install an expander with a lost cone-shaped tip. The rated portion of concrete mix is fed into the well as the rated depth is achieved. Drilling-casing pipes are withdrawn by pneumodrill reversing to the height of the expander. Pipes are fixed, and concrete mix is pressurised with compressed air, which is supplied at the pressure of 0.3 to 3.0 MPa. Then another rated portion of concrete mix is supplied, and operations are repeated, until drilling-casing pipes are withdrawn from soil. Besides, the concrete mix and compressed air are supplied into the well via the expander.
EFFECT: increased bearing capacity of a root pile.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF INJECTION PILE | 2014 |
|
RU2550620C1 |
METHOD OF ARRANGING INJECTION PILE | 2016 |
|
RU2637002C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
DEVICE FOR FORMATION OF WELLS FOR AUGER PILES | 2011 |
|
RU2483165C1 |
INJECTION PILE AND THE METHOD FOR ITS INSTALLATION | 2021 |
|
RU2771363C1 |
METHOD OF INJECTION PILE BUILDING | 2003 |
|
RU2238366C1 |
METHOD OF PILE PRODUCTION BY IMPRESSION | 2013 |
|
RU2554368C2 |
METHOD FOR INJECTION PILE BUILDING (VARIANTS) | 2004 |
|
RU2263745C1 |
BORED PILE WITH WIDENING | 2023 |
|
RU2824059C1 |
METHOD OF PRODUCING PILE BY IMPRESSION | 2015 |
|
RU2595102C1 |
Authors
Dates
2015-05-27—Published
2014-04-07—Filed