FIELD: oil and gas industry.
SUBSTANCE: invention relates to methods of current underground well workover. Method includes injection of silicon dioxide suspension that in itself does not have cementing properties, to cavities in the damaged cement enclosure or near it. At that silicon dioxide particles react with solidificated cement creating seals.
EFFECT: improved method.
8 cl, 12 dwg, 4 tbl
Title | Year | Author | Number |
---|---|---|---|
COMPOSITIONS AND METHODS OF WELL COMPLETION | 2015 |
|
RU2705638C2 |
COMPOSITIONS AND METHODS OF WELL COMPLETION | 2015 |
|
RU2718040C2 |
LIME-SILICA CEMENT WITH LOW CONTENT OF PORTLAND CEMENT | 2017 |
|
RU2724864C1 |
CONTROLLING HEAT OF HYDRATION BY DETERMINING CHARACTERISTICS OF BINDING COMPONENTS | 2017 |
|
RU2733765C1 |
USE OF MEASUREMENT OF WATER DEMAND TO PERFORM APPROXIMATION OF SPECIFIC AREA DURING CEMENTING OF WELL | 2017 |
|
RU2733758C1 |
SUSPENSION PREPARATION METHOD | 2017 |
|
RU2728755C1 |
FOAMING OF SET-DELAYED CEMENT COMPOSITIONS COMPRISING PUMICE AND HYDRATED LIME | 2014 |
|
RU2655669C2 |
GROUTING SOLUTION FOR CEMENTING GAS/OIL DRILL HOLES AND METHOD FOR PREPARATION THE SAME | 1988 |
|
RU2057250C1 |
SLOWLY SOLIDIFYING CEMENT COMPOSITIONS CONTAINING PUMICE AND RELATED METHODS | 2013 |
|
RU2586517C2 |
CEMENT SETTING ACTIVATORS FOR CEMENT COMPOSITIONS AND CORRESPONDING METHODS | 2014 |
|
RU2635413C2 |
Authors
Dates
2015-05-27—Published
2010-03-25—Filed