FIELD: process engineering.
SUBSTANCE: filling column comprises at least one dispensing point (I) with at least two products (A, B, C) as fuels and one extra product (A, B, C) as well as price calculation device (Ib) communicated with system (III) of accounting via cash terminals of filling station. Said price calculation device (Ib) comprises at least info on prices for aforesaid products (A, B, C). Flow monitors arranged at dispensing point (I) output data on consumption of filled products (A, B, C) to price calculation device (Ib). Aid price calculation device (Ib) allows for info on prices and consumption calculates purchasing price for filling by the Client. Note here that said purchasing price is then paid by the Client via said system (III) at cash terminals. First filling process over, measured is the time representing interval (21) of unlocking time whereat second filling process at the same dispensing point (I) can be initiated before paying of purchasing price.
EFFECT: perfected method.
13 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FUELLING AT FILLING STATION AND FILLING STATION | 2012 |
|
RU2515003C1 |
METHOD OF OPERATING GAS STATION AND GAS STATION | 2008 |
|
RU2399523C2 |
SYSTEM FOR METERING CONSUMPTION OF RESOURCES OF POWER PLANT AND METHODS FOR USE THEREOF | 2013 |
|
RU2604341C2 |
REFUELING COMPLEX FOR SERVICING AND OPERATION OF FILLING STATIONS WITH VERTICAL FIXATION OF RESERVOIR UNITS, SAID GAS STATION, REPLACEABLE RESERVOIR UNIT FOR IT | 2019 |
|
RU2725350C1 |
SYSTEM AND METHOD FOR GAS STATION REFUELING | 2021 |
|
RU2759131C1 |
METHOD OF SINGLE-PIECE/MULTI-UNIT FUEL FILLING STATION VERTICAL UNITS ARRANGEMENT AND INSTALLATION BY SCREW EMBEDMENT | 2015 |
|
RU2604763C1 |
FILLING STATION AND FUELLING PROCESS | 2011 |
|
RU2574485C2 |
METHOD FOR SIGNAL EXCHANGE IN SYSTEM FOR CONTROL OF FUEL FILLING STATION | 1993 |
|
RU2043653C1 |
TRADE COMPLEX WITH PNEUMATIC DELIVERY OF PRODUCTS | 1996 |
|
RU2155990C2 |
METHOD OF DETERMINATION OF FILTER WORKING STATE FOR LIQUID GEAR TRANSMISSION, SYSTEM OF LIQUID DELIVERY AND DEVICE MEASURING VOLUMETRIC FLOW FOR REALISATION OF SPECIFIED METHOD | 2006 |
|
RU2351908C2 |
Authors
Dates
2015-05-27—Published
2013-11-19—Filed