FIELD: oil and gas industry.
SUBSTANCE: device for pulse injection of liquid into a reservoir includes case, sleeve with central duct, positioned concentrically in the case, and process constriction in the form of removable bushing in the central sleeve duct. The case is installed on the sleeve on ball bearings. The sleeve features top and bottom rows of radial orifices with check valve placed between the orifices inside the sleeve and allowing for a flow upwards from below. Top and bottom rows of radial orifices are interconnected by a bypass duct between the case and the sleeve. The bypass duct features tangential vanes on the inner case surface, ensuring case rotation against the sleeve and partially overlapping and changing flow area of the bottom row of radial sleeve orifices by a ring featuring a row of through orifices. The ring is mounted outside of the sleeve opposite to the bottom row of radial sleeve orifices and is attached rigidly to the case. Removable bushing is installed in the central duct at the lower sleeve end.
EFFECT: higher reliability of operation.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR PULSE ACTION ON RESERVOIR | 2015 |
|
RU2583804C1 |
DEVICE FOR PULSE PUMPING OF LIQUID TO FORMATION | 2013 |
|
RU2543241C1 |
DEVICE FOR PULSED FLUID INJECTION AND RESERVOIR DEVELOPMENT | 2023 |
|
RU2810660C1 |
DEVICE FOR PULSED INJECTION OF FLUID INTO BED | 2013 |
|
RU2531954C1 |
DEVICE FOR CYCLIC FLUID INJECTION AND FORMATION DEVELOPMENT | 2024 |
|
RU2821866C1 |
METHOD AND DEVICE FOR CONTROLLED PUMPING DOWN TO FORMATIONS | 2012 |
|
RU2495235C1 |
METHOD FOR PROCESSING THE BOTTOMHOLE FORMATION ZONE AND THE DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2782227C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL AND EQUIPMENT FOR ITS IMPLEMENTATION | 2011 |
|
RU2451164C1 |
DEVICE FOR PULSE TREATMENT OF WELL WALLS | 2015 |
|
RU2585294C1 |
WELL FORMATION TREATMENT DEVICE | 2012 |
|
RU2509872C1 |
Authors
Dates
2015-06-20—Published
2014-04-15—Filed