SOLUBLE BRIDGE PLUG Russian patent published in 2015 - IPC E21B33/12 

Abstract RU 2553717 C2

FIELD: oil and gas industry.

SUBSTANCE: invention relates to the bridge plug to be installed in the well limited by the casing string. The bridge plug includes integrity component to maintain the anchor integrity or structural integrity in the well during usage creating pressure in its top part, at that the specified component is made with possibility of dissolution in the well and out of the material containing chemically active metal, that is selected from a group including aluminium, calcium, magnesium, and alloying element.

EFFECT: invention ensures drilling of the bridge plug.

23 cl, 5 dwg

Similar patents RU2553717C2

Title Year Author Number
TWO-PACKER LAYOUT FOR SHUTTING OFF UNSEALED SECTIONS OF PRODUCTION STRINGS OF OIL AND GAS WELLS 2018
  • Yuldashev Ramil Radikovich
  • Malyshev Mikhail Vladimirovich
RU2737747C2
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS 2007
  • Ist Lojd Eh. Ml.
  • Kurvill' Perri Uehjn
  • Altman Richard A.
  • Klehjton Robert
RU2395667C1
METHOD AND SYSTEM FOR HYDRAULIC FRACTURING 2010
  • Richard Bennett M.
  • Syuj Yan
RU2671373C2
METHOD OF MAKING GROOVES IN WELL BOREHOLE CASING 2011
  • Khajl' Mattias
  • Andrissen Frank
  • Tsvanenburg, Mir'Jam
RU2570210C2
METHOD AND SYSTEM OF FORMATION HYDRAULIC FRACTURING 2012
  • Richard Bennett M.
  • Sjuj Jan
RU2604600C2
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS 2011
  • Tolman Rehndi K.
  • Ehntchev Pavlin B.
  • Ankheles Bosa Renso M.
  • Petri Dennis Kh.
  • Sirls Kevin Kh.
  • Ehl'-Rabaa Abdel' Vadud Mokhammed
RU2571460C2
COMPLETION ASSEMBLY AND METHOD FOR WELL COMPLETION IN UNDERGROUND FORMATION 2008
  • Surdzhaatmadzha Dzhim B.
  • Khauehll Mehtt'Ju T.
RU2431036C2
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman Rendi K.
  • Morrou Timoti I.
  • Benish Timoti G.
RU2664989C1
PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) 2008
  • Ist Lojd Eh. Ml.
RU2412347C1

RU 2 553 717 C2

Authors

Stehfford Dzhek

Grison Billi

Fleming Dzhon

Marija Manuehl' P.

Dates

2015-06-20Published

2011-08-10Filed