FIELD: construction.
SUBSTANCE: platform comprises a body, a foundation part with a bottom slab equipped with ribs embedded into the foundation soil. At the same time the foundation in its lower part along the entire perimeter at the outer side is equipped with ploughshares with depth of submersion and distance between them determined on the basis of the given expression. The ploughshare width is also made from the mathematical expression.
EFFECT: reduced material intensity in development of a marine gravity platform, reduced volume of ballast for provision of ribs embedding into the foundation soil, increased stability and bearing capacity of the soil foundation, increased reliability and reduced risk of loss of gravity platform stability during the period of operation under action of combined external impact of loads.
4 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
GRAVITY-PILE PLATFORM AND METHOD OF ITS PLACEMENT ON SEA BED | 2015 |
|
RU2606484C1 |
GRAVITY PLATFORM WITH BURIED FOUNDATION | 0 |
|
SU1791528A1 |
METHOD FOR CONSOLIDATION OF GROUND BASE OF HYDROTECHNICAL STRUCTURE | 2015 |
|
RU2628348C2 |
MARINE GRAVITY-PILED PLATFORM AND METHOD OF ITS INSTALLATION ON SEA BOTTOM | 2011 |
|
RU2480557C1 |
METHOD OF CONSOLIDATION OF SOIL BASE OF HYDRAULIC ENGINEERING STRUCTURE | 2013 |
|
RU2558442C1 |
METHOD FOR ERECTING SUPPORT IN WATER OBSTACLE | 2003 |
|
RU2245962C1 |
METHOD TO INSTALL HYDRAULIC ENGINEERING STRUCTURE ONTO SEA BOTTOM | 2012 |
|
RU2487975C1 |
DESIGN OF GRAVITY FOUNDATION | 2012 |
|
RU2515446C2 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
FOUNDATION SLAB STRENGTHENED WITH SHELL IN PERMAFROST SOIL | 2013 |
|
RU2541692C2 |
Authors
Dates
2015-07-10—Published
2013-12-23—Filed