FIELD: oil and gas industry.
SUBSTANCE: group of inventions relates to the field of oil industry and can be used for enhanced oil recovery of the reservoir in the development of water-flooded reservoirs with viscous oil and bitumen at a late stage of development. The method comprises opening the reservoir with the ability to transfer the production well into the injection one, the reservoir processing, keeping the hole without any influence, intake of oil from the reservoir. At that a system of microwave electromagnetic generators with radiation frequency of 2.5 GHz is lowered into the injection well, connected to the slot antenna using the feeder. The length of the slot antenna is selected equal to the thickness of the aquifer of the reservoir. In the mode of injection, the water injection into the reservoir is carried out with simultaneous influence on the reservoir with microwave electromagnetic field, the radiation power is determined by the time of heating of the water injected in the downhole to the desired temperature. When filling 5-10% of the volume of the pore space of the formation, the well is maintained, the well is transferred into the production well, and the liquid intake from the production well is carried out.
EFFECT: increase of the effectiveness and economical efficiency of development of water-flooded reservoirs of high-viscosity oil, intensification of oil production in water-flooded reservoirs of high-viscosity oil by increasing the coverage with influence to the reservoir with heating in the bottomhole area of the reservoir of the production wells.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF DEPOSITS OF HEAVY OIL, OIL SANDS AND BITUMEN | 2019 |
|
RU2720338C1 |
DEVELOPMENT METHOD OF HIGH-VISCOUS OIL DEPOSIT | 2010 |
|
RU2454532C1 |
METHOD FOR EXPLOITATION OF DROWNED OIL DEPOSIT | 2002 |
|
RU2229588C1 |
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL DEPOSIT | 2012 |
|
RU2501941C2 |
METHOD TO DEVELOP DEPOSIT OF HIGHLY VISCOUS OIL | 2012 |
|
RU2480578C1 |
METHOD OF DEVELOPMENT OF DEPOSIT OF SUPERHIGH VISCOSITY OIL WITH WATER-BEARING INTERVALS | 2018 |
|
RU2679423C1 |
WELL STRUCTURE AND METHOD OF MULTIPAY OIL POOL DEVELOPMENT | 2007 |
|
RU2344272C2 |
PROCEDURE FOR ELIMINATION OF ANNULUS CIRCULATION | 2015 |
|
RU2597897C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2015 |
|
RU2578137C1 |
FLOODED OIL RESERVOIR DEVELOPMENT METHOD | 2007 |
|
RU2347895C1 |
Authors
Dates
2015-07-10—Published
2013-12-06—Filed