Abstract RU 2556755 C1

FIELD: construction.

SUBSTANCE: pile field design is developed in the potential foundation area; after that, load on one pile is calculated; total number of piles of the same configuration with coordinate fixation to locality is determined at each pile sinking point, as well as depth of static sounding and location of static sounding points is determined. Then, static sounding is performed at pile sinking points by indentation of a conical tip of the probe into soil. Parameters characterising resistance of soil on cone and on side surface of the pile at introduction of the probe are recorded every 0.2 m as per TEST-K4 devicea. Calculation of carrying capacity and parameters at check points are recorded and entered to a database. Then, dynamic tests of each driven pile are performed. After the driven pile is kept for 5-35 days, field tests of test piles are performed by means of a static pile test device by static load, thus picking up pile settlement readings from measuring instruments at the specified loads, and values of the pile carrying capacity are determined. Then, correlation of the obtained results with static sounding data and pile sinking forces is performed considering engineering and geological conditions of the construction site. Then, mass sinking of the rest piles is performed. When the specified force on the pile being sunken is achieved, sinking is stopped and the pile is cut on a certain level above the ground surface.

EFFECT: improving operating efficiency and reducing prime cost of erection and preliminary work, at erection of the foundation as a whole, at simultaneous improvement of durability and reliability.

5 cl, 6 dwg

Similar patents RU2556755C1

Title Year Author Number
METHOD FOR STAND-TESTING OF PILE FOUNDATION 1995
  • Andronov Evgenij Vladimirovich
RU2105102C1
METHOD FOR REINFORCEMENT OF PILE FOUNDATION 2019
  • Nuzhdin Matvej Leonidovich
  • Nuzhdin Leonid Viktorovich
  • Gabibov Fakhraddin Gasan Ogly
RU2722901C1
METHOD FOR REINFORCEMENT OF PILE FOUNDATION 2019
  • Nuzhdin Matvej Leonidovich
  • Nuzhdin Leonid Viktorovich
RU2728052C1
PILE-SLAB FOUNDATION AND METHOD OF ITS CONSTRUCTION 2000
  • Dubina M.M.
  • Tselitso V.M.
RU2163281C1
METHOD FOR ASSESSMENT OF DRILLED PIPE BEARING CAPACITY 2009
  • Novak Jurij Vladimirovich
  • Sychev Pavel Anatol'Evich
  • Bokhan Maksim Vasil'Evich
  • Mit'Kin Aleksandr Aleksandrovich
  • Radkevich Aleksej Ivanovich
  • Kulachkin Boris Ivanovich
  • Smirnov Lev Konstantinovich
  • Pronjuk Konstantin Ivanovich
RU2398936C1
METHOD OF FLOATING PILE LOAD-BEARING CAPACITY INCREASE 2004
  • Osipov Viktor Ivanovich
  • Filimonov Sergej Dmitrievich
RU2275470C1
FOUNDATION ERECTION METHOD 2004
  • Dubina Mikhail Mikhajlovich
  • Pan'Kov Oleg Olegovich
RU2269624C1
METHOD OF MEASURING THE DEPTH OF PENETRATION OF PILE INTO EARTH 0
  • Kvyatkovskij Dmitrij Vladimirovich
  • Nedilchenko Valerij Sergeevich
  • Sherman Anatolij Aleksandrovich
  • Rusanov Georgij Andreevich
SU958585A1
METHOD OF CONSTRUCTING A PILE FOUNDATION 0
  • Semizhonov Evgenij Mitrofanovich
  • Agranovskij Garold Grigorevich
SU920114A1
METHOD TO ERECT PILE FOUNDATION 2011
  • Presnov Oleg Mikhajlovich
  • Eresko Sergej Pavlovich
  • Loginov Semen Vladimirovich
RU2456408C1

RU 2 556 755 C1

Authors

Luzhbin Mikhail Dmitrievich

Dates

2015-07-20Published

2014-04-23Filed