FIELD: gas industry.
SUBSTANCE: invention relates to gas industry and is intended to limit and eliminate inflow of bottom water in gas producing wells. Proposed method comprises installation of surface equipment to perform water shutoff operations with application of coiled tubing (top-down): injector with guide arch, sealing device, upper riser, blowout preventor (BOP) unit, throttle, lower riser, preventer with shear seal plates; through the tubing string a flexible tubing string with a connector is lowered into the well, two check valves, emergency disconnector and jet nozzle to top perforations, close wedge and tube dies on BOP unit, process liquid is supplied through flexible tubing string for flushing of well bottom, wherein throttle nozzle should be open; after flushing of well bottom, opening of BOP wedge and tube dies, flexible tubing string is lifted, then the assembly is lowered to the well by flexible tubing string consisting of a connector, an inflatable packer, two check valves, emergency disconnector and funnel with oblique cut to flooded interval of formation, performing water-insulating composition pumping on micro-cement base with its forcing into watered part of productive formation for creation of water-proof screen and fixation of collector; then micro-cement barrel is installed in the well and flexible tubing string assembly is removed to day surface; well is left waiting for hardening of micro-cement; further, the well is repunched, developed and brought to the mode.
EFFECT: higher efficiency of waterproofing operations in gas producing wells flooded due to formation of bottom water cone.
1 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATING BOTTOM WATER CONE OF FORMATIONS LOCATED AT SHALLOW DEPTHS | 2023 |
|
RU2809475C1 |
METHOD FOR PREVENTION OF BOTTOM WATER INFLUX TO PRODUCING OIL WELL | 2016 |
|
RU2620684C1 |
METHOD OF ISOLATION OF WATER SUPPLY IN OIL-EXTRACTING WELL | 2017 |
|
RU2655495C1 |
METHOD OF BOTTOM WATER CONE CUTTING | 2016 |
|
RU2655490C2 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN A PETROLEUM PRODUCTION BOREHOLE FROM AN UNDERLYING AQUIFER | 2021 |
|
RU2776018C1 |
RECOVERING METHOD OF WORKING CONDITION OF GAS-OIL PRODUCTION WELL WITH HORIZONTAL AND/OR SUBHORIZONTAL END DURING OPERATION, AND TECHNOLOGICAL COMPLEX FOR METHOD'S IMPLEMENTATION | 2011 |
|
RU2482268C1 |
METHOD FOR ISOLATING THE INFLOW OF FORMATION WATER IN AN UNCASED HORIZONTAL SECTION OF THE WELLBORE | 2017 |
|
RU2661171C1 |
METHOD FOR ISOLATION OF FORMATION WATER INFLUX AT SECTIONS OF THEIR SUPPLY IN WELLS WITH HORIZONTAL TERMINATION | 2019 |
|
RU2707109C1 |
HORIZONTAL WELL OPERATION METHOD | 2014 |
|
RU2558090C1 |
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT | 2017 |
|
RU2661935C1 |
Authors
Dates
2020-07-15—Published
2020-01-28—Filed