FIELD: construction.
SUBSTANCE: invention relates to construction, namely to permafrost foundations. An erection method a pier foundation with an expanded base involves creation of a well by soil excavation, formation on the end of the cavity of the expanded base by arrangement in the lower part of the well of an explosive charge and its further blasting, with that, before cast concrete is introduced to the well, the foundation is reinforced. According to the invention, before the cavity of the enlarged base is formed, a casing pipe is introduced to the well to the level of the supposed enlarged based, and into the upper part of the casing pipe, which is not filled with concrete, there installed is a heat pipe after concreting, the lower end of which is arranged below lower permafrost level.
EFFECT: speed-up and simplification of erection of a foundation with a high load-carrying ability with simultaneous improvement of its reliability due to exclusion of warm-up of the pier foundation during summer season.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BUILDING SHALLOW FOUNDATION POST HAVING CAMOUFLET WIDENED PART | 2003 |
|
RU2244780C1 |
DRIVING METHOD OF DRIVEN HOLLOW PILE WITH A WIDENED BASE | 2018 |
|
RU2685719C1 |
EARTH PILE AND METHOD FOR MANUFACTURING EARTH PILES | 2021 |
|
RU2763656C1 |
METHOD OF PILE DRIVE DEVICE | 2014 |
|
RU2601630C2 |
METHOD OF ERECTION RAMMING DESIGN IN SOIL | 2015 |
|
RU2605213C1 |
METHOD OF ARRANGEMENT OF DRIVEN PILE IN A WELL WITH AN EXTENDED BASE | 2018 |
|
RU2678172C1 |
METHOD OF REINFORCEMENT OF FOUNDATIONS | 2008 |
|
RU2360071C1 |
METHOD OF DRILLED PILE MANUFACTURING | 2009 |
|
RU2389849C1 |
METHOD FOR CREATING BROADENING AT THE END OF PILE | 2016 |
|
RU2651655C2 |
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING | 2019 |
|
RU2720047C1 |
Authors
Dates
2015-08-10—Published
2014-01-20—Filed