FIELD: construction.
SUBSTANCE: invention relates to construction, namely to technology of construction of structures, for example piles in soils. Method includes formation of well, supply of hardening material, installation of switching discharger with electrodes in it, connected to source of pulsed electric discharges, excitation of high-voltage electric discharges with help of emitter. Wherein each high-voltage discharge is performed with simultaneous supply of non-detonating exothermic mixture in interelectrode space of emitter and its burning at high-voltage electrochemical explosion. Wherein non-detonating exothermic mixture in interelectrode space is dibenzoylperoxide, or a mixture of dibenzoylperoxide with ditertbutylperoxide, or mixture of dibenzoylperoxide with tertbutylperbenzoate in ratios in mixtures of (1:1)-(3:1).
EFFECT: technical result is increased efficiency and reliability of method of replacement of gas composition on mix of various peroxide compounds, which are individual compounds and possess ability of forming strong shock wave during decomposition to create broadening.
1 cl, 2 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD OF BUILT-IN STRUCTURAL ELEMENTS IN SOIL | 2002 |
|
RU2221918C2 |
METHOD FOR CAST-IN-PLACE PILE ERECTION | 2005 |
|
RU2318960C2 |
METHOD OF PILE PRODUCTION | 2017 |
|
RU2654097C1 |
CAST-IN-PLACE PILE FORMING METHOD | 2004 |
|
RU2256029C1 |
METHOD OF CAST-IN-PLACE PILE MAKING | 2000 |
|
RU2193625C2 |
METHOD FOR PRODUCING CAST-IN-PLACE PILES | 1993 |
|
RU2039156C1 |
METHOD FOR ERECTION OF BORED PILE IN SOIL-CEMENT COATING | 2019 |
|
RU2720047C1 |
METHOD OF PRODUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2100525C1 |
DRILL STRING FOR ERECTION OF BORED PILE IN SOIL-CEMENT CLADDING | 2019 |
|
RU2735077C1 |
CAST-IN-PLACE PILE FORMING METHOD | 2003 |
|
RU2250957C2 |
Authors
Dates
2016-12-20—Published
2015-07-01—Filed