FIELD: oil and gas industry.
SUBSTANCE: plant comprises a frame, a tank, a pump unit, process unions, pipelines and stop valves. The tank consists of bottom settling zone with union to discharge mechanical impurities with volume of V1 and top working capacity with volume of V2, ratio of V1 to V2 is 0.65/4.35. The tank is equipped with fluid extraction pipeline. In the tank there is fluid return tube and fluid recirculation tube. The fluid extraction pipeline is horizontal and placed at the level of the bottom settling zone; it has the biggest diameter among all pipelines and tubes. The fluid return tube is vertical and descending from the top; it is placed in the centre of the tank and dead-ended from below; it is perforated in the bottom part; it has medium diameter in comparison with all pipelines and tubes. Fluid recirculation tube is parallel to fluid return tube; it is dead-ended from below and perforated along the whole height; it has the least diameter among all pipelines and tubes; dead-ended parts of tubes are placed above the bottom setting zone in the tank; the fluid extraction pipeline is equipped with stop valves allowing connection of the above pipeline with fluid recirculation tube, it is also equipped with filter screen. Oil production is intensified.
EFFECT: preventing scaling, asphaltene, resin and paraffin deposits; protecting downhole equipment from corrosion.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CLEANING NEAR WELLBORE REGION OF INJECTION WELLS | 2007 |
|
RU2332557C1 |
OIL-PRODUCING COMPLEX | 2014 |
|
RU2571124C2 |
CIRCULATION WATER SUPPLY SYSTEM FOR BORE-HOLE | 1991 |
|
RU2084611C1 |
METHOD OF PROCESS LIQUID PUMPING IN THE WELL AND PLANT FOR ITS IMPLEMENTATION | 2016 |
|
RU2624856C1 |
METHOD FOR CLEANING THE BOTTOMHOLE FORMATION ZONE OF A WELL | 2021 |
|
RU2775368C1 |
INSTALLATION FOR STORAGE AND DOSED SUPPLY OF WORKING AGENTS TO PRODUCTIVE FORMATION | 2018 |
|
RU2704402C1 |
MOBILE CHEMICAL PLANT FOR SUPPLY OF CHEMICALS FOR TREATMENT OF OIL-GAS PRODUCTION WELLS AND PIPELINES | 2010 |
|
RU2456435C2 |
METHOD OF CAUSING FLUID INTRUSION FROM WELL | 2011 |
|
RU2470150C1 |
PUMPING CEMENTING UNIT | 2019 |
|
RU2716317C1 |
PRODUCTION BED TREATMENT METHOD | 2004 |
|
RU2258803C1 |
Authors
Dates
2015-08-20—Published
2014-09-02—Filed