WELL DEVELOPMENT AND OPERATION METHOD AND CONFIGURATION OF DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION Russian patent published in 2015 - IPC E21B43/25 E21B43/12 

Abstract RU 2559999 C2

FIELD: mining.

SUBSTANCE: according to the method the well is put into operation, the borehole production is extracted by means of an electric centrifugal pump and the repair-and-renewal operations are performed simultaneously with carrying out tripping operations, well washing and gaging, the downhole equipment is mounted using tightly screwed up pump and compressor pipes of the electric centrifugal pump and a packer, tubing string, and decolmatation. During the well development on its surface the downhole equipment is installed. The power cable end is passed through details of anchor and separating devices of the packer and tightly connected to the variable frequency drive of the electric centrifugal pump. During the installation the electric centrifugal pump fitted with the input module and the unit of sensors of telemetric system of monitoring of borehole product parameters, stop and flushing valve and knock-off the valves which are tightly screwed together by tubings are lowered into the production string. The submersible downhole equipment is screwed together with a trunk of a packer on which mount the anchor and separating devices, and in cable input of a packer pressurize a power cable. From above the packer is screwed together tightly with the second knock-off valve which is screwed together a tubing with the coupling of the reference branch pipe. The latter using the coupling on another its end is screwed together with the tubing string to the end of which through the coupling the casing swage is screwed in. Lowering is continued until achievement by the packer of an interval of segregation of tubular annulus with fixation of the packer sitting depth being adjusted using the reference point. The tubing string with the downhole equipment is lifted on height equal to length of the established casing swage which replace with a branch pipe of the respective length. Using the anchor device the packer is fixed in the production string and leakiness is eliminated by tensioning of the tubing string to a certain load of the packer using the dynamometer. The tubing string through the casing swage is connected tightly to the faceplate and fixed on the production string flange in the wellhead. After that by gradual increase of frequency of rotation of the variable frequency drive of the electric centrifugal pump the well is put into operating mode of operation with monitoring of parameters of the borehole product by means of the telemetric system.

EFFECT: well operation reliability improvement.

10 cl, 1 dwg

Similar patents RU2559999C2

Title Year Author Number
OPERATING METHOD OF WELLS, AND ARRANGEMENT OF DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION 2014
  • Nikolaev Oleg Sergeevich
RU2563268C2
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION 2014
  • Nikolaev Oleg Sergeevich
RU2562641C2
METHOD OF DETERMINING AIR-TIGHTNESS OF DOWNHOLE EQUIPMENT WITH DUAL EXTRACTION OF FLUIDS FROM WELL WITH SUCKER-ROD AND ELECTRIC-CENTRIFUGAL PUMP 2015
  • Ibragimov Nail Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Dzhafarov Mirzakhan Atakishi Ogly
  • Matveev Dmitrij Valerevich
  • Khazipov Farid Raisovich
RU2589016C1
UNIT FOR SIMULTANEOUS SEPARATE OIL PRODUCTION BY WELL WITH LATERAL INCLINED SHAFT 2019
  • Nikolaev Oleg Sergeevich
RU2702180C1
MULTIPAY WELL OPERATION METHOD AND OIL PRODUCTION UNIT FOR ITS IMPLEMENTATION 2019
  • Nikolaev Oleg Sergeevich
RU2728741C1
UNIT FOR SIMULTANEOUS SEPARATE PRODUCTION OF OIL BY WELL WITH INCLINED DIRECTED FACES 2019
  • Nikolaev Oleg Sergeevich
RU2702801C1
DEEP-WELL PUMPING UNIT FOR OIL PRODUCING (VERSIONS) 2019
  • Nikolaev Oleg Sergeevich
RU2702187C1
OIL PRODUCING PLANT 2018
  • Nikolaev Oleg Sergeevich
RU2691039C1
CIRCULATION VALVE OF PRESSURE EQUALISATION AND WELL PUMP UNIT 2013
  • Nikolaev Oleg Sergeevich
RU2531692C2
DOWNHOLE PLANT FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO BEDS OF SINGLE WELL (VERSIONS) 2014
  • Nikolaev Oleg Sergeevich
RU2546685C2

RU 2 559 999 C2

Authors

Nikolaev Oleg Sergeevich

Dates

2015-08-20Published

2014-09-19Filed