FIELD: aircraft engineering.
SUBSTANCE: proposed system comprises assembly units, control units, pipelines, elements of fastening to aircraft airframe, air bleed system, air-conditioning system, air preparation subsystem for neutral gas system, all being arranged in a definite manner. Air bleed system comprises subsystem for air bleed from mid-flight engine and from auxiliary plant while air-conditioning system comprises two air cooling plants. air cooling plant comprises secondary and primary heat exchangers, plenum with check valve, all being arranged in the definite manner. Air preparation subsystem for neutral gas system comprises air-to-air heat exchanger, regulator, temperature gage, seals, insulators and fasteners.
EFFECT: higher safety and reliability.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
AIRCRAFT AIR CONDITIONING SYSTEM ON THE BASIS OF ELECTRIC DRIVERS AND REVERSE VAPOR COMPRESSION REFRIGERATING PLANTS | 2017 |
|
RU2658224C1 |
COMPLEX AIR CONDITIONING SYSTEM OF THE AIRCRAFT | 2017 |
|
RU2682758C1 |
INTEGRATED ONBOARD EQUIPMENT SET OF DIFFERENT ARCHITECTURE | 2015 |
|
RU2592193C1 |
PASSENGER AIRCRAFT NEUTRAL GAS SYSTEM | 2014 |
|
RU2578901C1 |
AEROSPACE CRAFT WITH NUCLEAR PROPULSOR AND AEROSPACE FLIGHTS PERFORMED THEREBY | 2013 |
|
RU2574295C2 |
AIR BLOWER FOR AIRCRAFT AIR CONDITIONING SYSTEM | 2023 |
|
RU2806133C1 |
AIRCRAFT AIR-CONDITIONING SYSTEM | 2003 |
|
RU2271314C9 |
ENERGY-INTENSIVE AIR CONDITIONING SYSTEM FOR AIRCRAFTS | 2023 |
|
RU2807448C1 |
MODULAR ELECTRICALLY-DRIVEN AUXILIARY GAS-TURBINE PLANT | 2006 |
|
RU2322598C1 |
SYSTEM FOR PREPARATION OF AIR FOR FLYING VEHICLE EQUIPPED WITH DOUBLE-FLOW TURBOJET ENGINE | 1992 |
|
RU2084378C1 |
Authors
Dates
2015-08-20—Published
2014-06-06—Filed