FIELD: construction.
SUBSTANCE: topping-out method involves arrangement of an additional foundation outside a basic building, vertical load-carrying structures on the outer side of external walls of the basic building, arrangement of a load-carrying framework of a top-out in the form of one or more two-storied load-carrying tiers that are in-series located one above another as to the top-out height. Load-carrying metal trusses are installed on the top floor of the two-storied tier, and vertical braces are mounted on the ground floor in the plane of the load-carrying trusses. After trusses and vertical braces are installed, intermediate floors are arranged along lower and upper flanges of the trusses.
EFFECT: reduction of labour costs at erection of a top-out.
4 cl, 19 dwg
Title | Year | Author | Number |
---|---|---|---|
BEARING STRUCTURE OF MULTISTOREY BUILDING STRUCTURE (VERSIONS) AND METHOD OF ERECTION OF MULTISTOREY LONG SPAN STRUCTURE | 2015 |
|
RU2596228C1 |
METHOD FOR CONSTRUCTING BUILDING ADDITION | 2010 |
|
RU2442868C1 |
GIRDERLESS FRAME OF PRECAST MONOLITHIC REINFORCED CONCRETE (VERSIONS) | 2015 |
|
RU2588229C1 |
METHOD FOR RECONSTRUCTION AND SUPERSTRUCTURE ERECTION ON BUILDINGS | 2011 |
|
RU2484219C2 |
CONSTRUCTION OF RESIDENTIAL BUILDING OF SECONDARY DEVELOPMENT | 1999 |
|
RU2174579C2 |
METHOD OF ERECTION OF SUPERSTRUCTURE AT RECONSTRUCTION OF BUILDING | 2015 |
|
RU2575914C1 |
METHOD TO ERECT ADDITIONAL STORIES FOR BUILDING RECONSTRUCTION | 2006 |
|
RU2312960C1 |
METHOD OF RECONSTRUCTION OF BUILDINGS AND STRUCTURES | 2023 |
|
RU2820548C1 |
METHOD OF RECONSTRUCTION AND VERTICAL EXTENSION OF BUILDINGS | 2015 |
|
RU2598615C1 |
SUPERSTRUCTURE BUILDING AND IMPLEMENTATION THEREOF IN RECONSTRUCTION | 2013 |
|
RU2579073C2 |
Authors
Dates
2015-08-20—Published
2014-04-22—Filed