METHOD OF COMPLETION OF HORIZONTAL PRODUCTION WELL CONSTRUCTION WITH DEPOSIT INTERVAL HYDRAULIC FRACTURING Russian patent published in 2015 - IPC E21B43/02 

Abstract RU 2564316 C1

FIELD: oil and gas industry.

SUBSTANCE: during the method implementation the production casing is run and secured prior to the beginning of the well horizontal section, then the deposit interval hydraulic fracturing is performed in zones of the well bore that differ by the porosity and permeability characteristics by 1.5-1.6 times, in the well bore on the process pipes string the liner plugged at bottom and hydraulically disconnected, it has filters, between them the casing oil swelling packers are installed, at that number of the filters is equal to number of intervals of the deposit hydraulic fracturing, the casing oil swelling packers are installed with possibility of tight separation of intervals of the deposit hydraulic fracturing from each other during contact with oil. On the external surface of each filter the oil swelling filter in form of the elastic hose with holes is installed. At the contact with water the holes in the elastic hose shrink and tightly close from outside the holes in the filters. The process pipes string is disconnected from the plugged at bottom removable lining, the process pipes string is removed to the surface, pipes with pump are run in the horizontal well, and the horizontal well is put into operation.

EFFECT: increased efficiency and reliability of the method, simplified process, increased oil recovery of the production deposit.

4 dwg

Similar patents RU2564316C1

Title Year Author Number
METHOD FOR COMPLETION OF CONSTRUCTION OF PRODUCTION WELL WITH HORIZONTAL END OF WELLBORE 2019
  • Sannikov Yurij Aleksandrovich
  • Klevtsur Anatolij Petrovich
  • Gorbunov Aleksandr Gennadevich
  • Oblasova Lyudmila Anatolevna
  • Zevakov Mikhail Evgenevich
  • Tukmakova Tatyana Nuriakhmetovna
RU2726096C1
METHOD OF FITTING WELL FILTER IN HORIZONTAL WELL 2012
  • Ibatullin Ravil' Rustamovich
  • Valovskij Vladimir Mikhajlovich
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Rinat Gabdrakhmanovich
RU2514040C1
METHOD OF PREVENTING SAND TRANSFER TO WELL 2019
  • Khisamov Rais Salikhovich
  • Akhmetgareev Vadim Valerevich
RU2713017C1
CONSTRUCTION FINISHING METHOD FOR HORIZONTAL PRODUCER 2012
  • Ibatullin Ravil' Rustamovich
  • Valovskij Vladimir Mikhajlovich
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
RU2516062C1
CONSTRUCTION FINISHING METHOD FOR HORIZONTAL STEAM INJECTOR 2012
  • Ibatullin Ravil' Rustamovich
  • Valovskij Vladimir Mikhajlovich
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
RU2515740C1
METHOD OF FITTING WELL SCREEN IN HORIZONTAL STEAM-INJECTION WELL 2013
  • Ibatullin Ravil' Rustamovich
  • Valovskij Vladimir Mikhajlovich
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Rinat Gabdrakhmanovich
RU2522031C1
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Salimov Vjacheslav Gajnanovich
RU2547892C1
FORMATION IN THE WELL INTERVAL BY INTERVAL MULTI-STAGE HYDRAULIC FRACTURING PERFORMANCE METHOD AND A DEVICE FOR ITS IMPLEMENTATION 2018
  • Korabelnikov Mikhail Ivanovich
  • Korabelnikov Aleksandr Mikhajlovich
RU2682391C1
WELL COMPLETION METHOD AND DEVICE FOR ITS IMPLEMENTATION 2023
  • Zaripov Ildar Mukhamatullovich
  • Iskhakov Albert Ravilevich
RU2798540C1
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL 2019
  • Khusainov Ruslan Fargatovich
  • Ismagilov Fanzat Zavdatovich
  • Tabashnikov Roman Alekseevich
RU2708747C1

RU 2 564 316 C1

Authors

Makhmutov Il'Gizar Khasimovich

Salimov Oleg Vjacheslavovich

Zijatdinov Radik Zjauzjatovich

Girfanov Il'Dar Il'Jasovich

Urazgil'Din Rais Nafisovich

Dates

2015-09-27Published

2014-10-13Filed