CONSTRUCTION FINISHING METHOD FOR HORIZONTAL STEAM INJECTOR Russian patent published in 2014 - IPC E21B43/02 

Abstract RU 2515740 C1

FIELD: oil and gas industry.

SUBSTANCE: in drilling, seepage-volume characteristics of the bed and their alteration over the borehole are defined, the borehole is divided into zones that differ in said characteristics by 1.5-1.6 times to select the filter performance separately for each zone and quantity of holes. In the filter openings under the plugs mesh filtering elements are installed, the production string is run in with the filter equipped with the behind-the-casing oil-swellable packers, which are set at boundaries of the areas with different seepage-volume characteristics. The production string is set up, the coil tubing is run in up to the well bottom, then it is transferred from the well bottom to the head with simultaneous pumping of polyacrylamide-based gel through it thus pouring the lower perimeter of the filter. When gel coagulation time is over the chemical reagent is injected through the coil tubing to the upper perimeter of the filter, the well is hold for the time of the plugs destruction in the filter openings in the upper perimeter of the filter, then reaction products are washed out.

EFFECT: improving quality of the stratum penetration, efficient impact of the working agent on the deposit.

3 dwg, 1 tbl

Similar patents RU2515740C1

Title Year Author Number
METHOD OF FITTING WELL SCREEN IN HORIZONTAL STEAM-INJECTION WELL 2013
  • Ibatullin Ravil' Rustamovich
  • Valovskij Vladimir Mikhajlovich
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Rinat Gabdrakhmanovich
RU2522031C1
CONSTRUCTION FINISHING METHOD FOR HORIZONTAL PRODUCER 2012
  • Ibatullin Ravil' Rustamovich
  • Valovskij Vladimir Mikhajlovich
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
RU2516062C1
METHOD OF FITTING WELL FILTER IN HORIZONTAL WELL 2012
  • Ibatullin Ravil' Rustamovich
  • Valovskij Vladimir Mikhajlovich
  • Makhmutov Il'Gizar Khasimovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Rinat Gabdrakhmanovich
RU2514040C1
METHOD OF COMPLETION OF HORIZONTAL PRODUCTION WELL CONSTRUCTION WITH DEPOSIT INTERVAL HYDRAULIC FRACTURING 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
  • Urazgil'Din Rais Nafisovich
RU2564316C1
METHOD FOR DEVELOPING SUPERVISCOUS OIL DEPOSITS 2023
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Garifullin Marat Zufarovich
RU2803344C1
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT 2017
  • Leontev Dmitrij Sergeevich
  • Pasynkov Andrej Geroevich
  • Aleksandrov Vadim Mikhajlovich
  • Ponomarev Andrej Aleksandrovich
  • Kleshchenko Ivan Ivanovich
  • Ovchinnikov Vasilij Pavlovich
RU2669950C1
METHOD FOR DEVELOPING SUPERVISCOUS OIL DEPOSITS 2023
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Garifullin Marat Zufarovich
RU2803347C1
METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS 2014
  • Tsygankov Stanislav Evgen'Evich
  • Kas'Janenko Andrej Aleksandrovich
  • Dorofeev Aleksandr Aleksandrovich
  • Vorob'Ev Vladislav Viktorovich
  • Sopnev Timur Vladimirovich
  • Zav'Jalov Sergej Aleksandrovich
RU2560763C1
METHOD OF PREVENTING SAND TRANSFER TO WELL 2019
  • Khisamov Rais Salikhovich
  • Akhmetgareev Vadim Valerevich
RU2713017C1
DEVELOPMENT METHOD OF MULTILAYER NON-HOMOGENEOUS OIL DEPOSIT 2011
  • Khisamov Rais Salikhovich
  • Zaripov Azat Timer'Janovich
  • Asadullin Marat Fagimovich
  • Zaripova Lejlja Razilevna
  • Zijatdinov Radik Zjauzjatovich
RU2459934C1

RU 2 515 740 C1

Authors

Ibatullin Ravil' Rustamovich

Valovskij Vladimir Mikhajlovich

Makhmutov Il'Gizar Khasimovich

Zijatdinov Radik Zjauzjatovich

Zhirkeev Aleksandr Sergeevich

Dates

2014-05-20Published

2012-12-28Filed