FIELD: mining.
SUBSTANCE: claimed method consists in erection of some sea stationary platforms, sea bottom complexes, underwater in-field and main pipelines, well products stores and unloading plants. Note here that at least one of said platforms is an underwater version with thrust unit secured to the sea bottom, thrust unit top gage being located below water level by the maximum clearance of iceberg underwater part gage. Note also that all underwater platforms are structurally and functionally connected by electric cables and condensate and gas pipelines. Regular seismic sounding is performed in the area of terminals by passive sounding of sea bottom and analysis of microseismic vibrations of the earth crust.
EFFECT: higher reliability of construction and operation.
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT OF MARINE DEEP SEA OIL-AND-GAS DEPOSITS | 2013 |
|
RU2547161C2 |
AUTONOMOUS BOTTOM WIDEBAND SEISMIC STATION | 2014 |
|
RU2572047C1 |
HYDROCHEMICAL BOTTOM STATION FOR GEOLOGIC MONITORING OF WATER AREAS | 2014 |
|
RU2566599C1 |
METHOD OF DETERMINING PROBABILITY OF CATASTROPHIC PHENOMENA | 2011 |
|
RU2489736C1 |
MARINE SELF-CONTAINED BOTTOM STATION FOR SEISMIC SURVEY AND SEISMOLOGICAL MONITORING | 2014 |
|
RU2572046C1 |
UNDERWATER OBSERVATORY | 2011 |
|
RU2468395C1 |
METHOD OF GEOCHEMICAL EXPLORATION | 2012 |
|
RU2525644C2 |
METHOD OF GEOCHEMICAL PROSPECTING FOR GEOECOLOGICAL MONITORING OF OFFSHORE OIL-AND-GAS-BEARING ZONES | 2012 |
|
RU2513630C1 |
METHOD FOR DETERMINING PROBABILITY OF CATASTROPHIC PHENOMENA | 2011 |
|
RU2462734C1 |
METHOD FOR SEISMIC PROSPECTING HYDROCARBONS AND METHOD OF DETERMINING ATTITUDE OF PRODUCING FORMATIONS ON HYDROCARBONS AND SEISMIC STATION FOR REALISING SAID METHOD | 2010 |
|
RU2433425C2 |
Authors
Dates
2015-11-10—Published
2014-07-04—Filed