FIELD: measurement equipment.
SUBSTANCE: method of upper atmosphere probing is based on measurement and prediction of a spacecraft (SC) orbit and measurement of physical parameters of atmosphere. SC existence time is predicted. The moment of time to start landing operations is determined to land the spaceraft in the specified point on the Earth. The moment of time is determined to start probing, which corresponds to the specified duration of probing and the possibility to land the SC in this point. To the moment of probing start they discharge a capsule with scientific equipment on a wire from the SC and start measurement of physical parameters of atmosphere with contact of used test devices and tested environment. Probing is stopped, when landing operations are started.
EFFECT: provision of specified duration of upper atmosphere probing.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROBING UPPER ATMOSPHERE | 2016 |
|
RU2655645C1 |
METHOD OF PROBING SEISMIC AND ORBITAL EFFECTS AND VARIATIONS OF UPPER ATMOSPHERE DENSITY | 2019 |
|
RU2705161C1 |
DEPLOYMENT OF SPACE ROPE SYSTEM AT DELIVERY OF LANDER FROM ORBITAL STATION TO GROUND | 2014 |
|
RU2564930C1 |
METHOD OF RAPID TESTING OF ATMOSPHERE, EARTH SURFACE AND OCEAN | 1992 |
|
RU2041476C1 |
METHOD OF DEPLOYMENT OF ORBITAL CABLE SYSTEM | 1996 |
|
RU2112714C1 |
LONG-ENDURANCE MANNED ORBITAL CABLE COMPLEX | 1993 |
|
RU2088491C1 |
SYSTEM FOR CLEANING OUTER SPACE FROM OBJECTS OF SPACE DEBRIS | 2018 |
|
RU2704645C1 |
METHOD OF CONNECTING SPACE OBJECTS IN SPACE | 2015 |
|
RU2583255C1 |
METHOD OF SPACE REFUSE WITHDRAWAL FROM PAYLOAD ORBIT EXPLOITING CARRIER ROCKET SEPARATED PART AND ACCELERATING UNIT, AND DEVICE TO THIS END | 2010 |
|
RU2462399C2 |
METHOD OF DEPLOYMENT OF ORBITAL CABLE SYSTEM | 1996 |
|
RU2112715C1 |
Authors
Dates
2015-11-10—Published
2014-04-01—Filed