FIELD: construction.
SUBSTANCE: at places of connecting welds and other joints exit to surface the sealing compound is applied; material of the sealing compound with ability to penetrate in parts of starved spot with width from 3 to 20 mm, length from 20 to 180 mm is selected, it polymerises in gap with polymerisation time 12 h maximum at temperature from plus 15 to plus 25°C, and interacts with non-active surfaces, the sealing compound is applied along the filled gaps by broken line.
EFFECT: invention eliminates air bubbles and starved spots by the method acceptable during honeycomb panels manufacturing.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SEALING-UP CELLULAR UNIT | 1999 |
|
RU2159724C1 |
ERECTION OF HEAT PIPES IN THREE-PLY PANELS | 2013 |
|
RU2547743C2 |
METHOD OF MANUFACTURE OF THREE-LAYER PANEL | 2005 |
|
RU2286290C1 |
PANEL WITH HONEYCOMB FILLER AND METHOD FOR ITS PRODUCTION | 1993 |
|
RU2035563C1 |
CURING ACTIVATOR FOR ANAEROBIC ADHESIVES AND SEALANTS | 2015 |
|
RU2597089C2 |
COMMUNICATION, TV BROADCASTING AND REPEATER SATELLITE | 2003 |
|
RU2227108C1 |
METHOD OF PRODUCING THREE-LAYER CELLULAR PANEL WITH HEAT TUBES BUILT THEREIN | 2009 |
|
RU2409471C1 |
PRODUCTION OF LARGE-SIZED THREE-PLY PANELS | 2013 |
|
RU2547735C2 |
METHOD OF PRODUCING FACE SEAL FRICTION RINGS | 0 |
|
SU1753132A1 |
METHOD FOR MANUFACTURE OF THREE-LAYERED CELLULAR PANEL WITH EMBEDDED HEAT PIPES | 2021 |
|
RU2779440C1 |
Authors
Dates
2015-12-20—Published
2013-08-13—Filed