FIELD: mining.
SUBSTANCE: claimed model consists of the bottom fluid ejection chamber and top chamber to intake fluid ejected from said bottom chamber. Besides, it includes the chamber for accumulation of the fluid-ejection gas elastic energy communicated with said bottom chamber. Also it incorporates the gas elastic energy source and two pipes connecting said top and bottom chambers. One pipe feeds fluid from the top chamber to the bottom chamber while the second pipe ejects fluid and gas from the bottom chamber to top chamber. Note here that the first pipe lower end is located below the second pipe lower end. The second pipe upper end is located above the first pipe upper end. The bottom chamber is integrated with the chamber for accumulation of the fluid-ejection gas elastic energy. The top chamber is tightly isolated, save the heat exchange, from the ambient medium. Low-boiling fluids are used as ejection fluids. Saturated steam of ejection fluid is used as the gas. The gas elastic energy source is composed by heat source arranged nearby the fluid ejection chamber.
EFFECT: comprehensive geyser model with all main components of natural geyser.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
GEYSER | 1991 |
|
RU2020288C1 |
GEOTECHNICAL WELL PNEUMATIC AND PULSED STIMULATION TOOL | 2006 |
|
RU2331763C1 |
AIR-AND-WATER CLOCK DEVICE (VERSIONS) | 2008 |
|
RU2407051C2 |
METHOD OF NATURAL GEYSER SIMULATION AND DEVICE TO THIS EFFECT | 2006 |
|
RU2331815C2 |
AIR FOUNTAIN DEVICE | 2001 |
|
RU2218203C2 |
METHOD AND DEVICE FOR CATCHING AND RECUPERATING VAPORS OF HYDROCARBONS | 2004 |
|
RU2316384C2 |
HOVERING BODY | 2003 |
|
RU2239483C1 |
CALORIC ENGINE UNIT HEATING SYSTEM | 2016 |
|
RU2641775C1 |
METHOD OF USAGE GEOTHERMAL ENERGY "FILL WELL" | 2006 |
|
RU2341736C2 |
GENERATION METHOD OF MECHANICAL (ELECTRIC) POWER BY MEANS OF STIRLING ENGINE USING HEAT OF SECONDARY POWER RESOURCES, GEOTHERMAL SOURCES AND SOLAR POWER FOR ITS OPERATION | 2008 |
|
RU2406853C2 |
Authors
Dates
2015-12-27—Published
2014-10-17—Filed