FIELD: transport.
SUBSTANCE: in compliance with claimed process, first, location (p1) of locomotive (10) is defined at track (100) of hump yard relative to gear (60) to be broken up which moves from locomotive (10) at in-track to hump yard. Then, location (p2) of front end of said gear (60) facing the hump yard is defined. Said locations (p1, p2) are used to define the spacing (d) between locomotive (10) and said front end of the gear (60) to be broken up. Defined spacing (d) is compared with the reference magnitude for the length of gear (60) to be broken up. Claimed device comprises the first meter (11) to define the location (p1), second meter (120) to define the location (p2) and evaluation device (130) to define the distance (d) from said locations (p1, p2).
EFFECT: higher efficiency.
24 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND SYSTEM FOR CONTROLLING ROLLING STOCK DURING THRUSTING AND BREAKING FROM RAILROADS HUMP YARD | 2019 |
|
RU2705035C1 |
AUTOMATIC SYSTEM TO UNCOUPLE CARS ON HUMP YARD | 2010 |
|
RU2450946C1 |
RAILWAY STATION PROCESS CONTROL METHOD | 2020 |
|
RU2738779C1 |
0 |
|
SU48449A1 | |
OPERATING METHOD OF TECHNICAL EQUIPMENT OF SORTING HUMP AND CONTROL SYSTEM OF SUCH HUMP | 2017 |
|
RU2729132C1 |
METHOD OF FREIGHT CAR BRAKE OPERATION CONTROL | 2011 |
|
RU2476340C1 |
DEVICE AND METHOD OF DEFINING LOCATION OF RESOURCES WITH RAILWAY STATION LIMITS | 2006 |
|
RU2473443C2 |
SYSTEM FOR YARDS OPERATING CONTROL IN RAILWAY NETWORK COURSE | 2012 |
|
RU2500558C1 |
TRAINING COMPLEX FOR MARSHALLING YARD OPERATING PERSONNEL | 2023 |
|
RU2810931C1 |
METHOD FOR STOPPING RAILWAY WAGON ON SORTING TRACKS OF MARSHALLING YARD | 2015 |
|
RU2577619C1 |
Authors
Dates
2016-02-10—Published
2012-05-07—Filed