FIELD: building.
SUBSTANCE: invention relates to the field of construction and operation of nuclear power stations and, in particular, to the period of the prestressing, testing and subsequent operation of the hermetically sealed reactor containments offices reactor. Method is specified on the labeling section of the protective containment controlled points and performing cycle-wise determine their position. In this study surveying created with reference to the axes forming the capital or building structures protective containment or structural elements of technological equipment installed in the containment. In monitoring the internal and (or) the external geometric parameters determine the protective containment phases after complete erection of the sealed containment after its complete program voltage. When tested at the stage of creating the maximum internal pressure and subsequently the operation during each scheduled preventive maintenance, according to the results obtained phased interstage determines the amount of displacement parameters of the test points. Specify interstage movements controlled points determine the safety factor of constructions protective containment and determine the condition of compliance with the operational reliability of the protective containment.
EFFECT: technical result is to increase the accuracy of the estimate of operational reliability sealed protective casings according to the results of the prestressing, the tests and the subsequent maintenance period.
1 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINATION OF DEFORMATION CHARACTERISTICS OF PROTECTIVE TIGHT SHELL | 2013 |
|
RU2546990C1 |
METHOD TO DETECT DEFORMATION CHARACTERISTICS OF STRUCTURES | 2010 |
|
RU2426089C1 |
PROCEDURE FOR DIAGNOSIS OF GEOMETRICAL PARAMETERS OF BASE MOUNTING OF BRIDGE CRANE OF CIRCULAR ROTATION | 2010 |
|
RU2425348C1 |
PROCEDURE OF GEOMETRIC PARAMETRES DIAGNOSIS OF BOGIE OF RADIAL OPERATION BRIDGE CRANES | 2008 |
|
RU2384831C1 |
METHOD OF CONTROLLING POSITION OF ABOVE-GROUND PIPELINES UNDER PERMAFROST CONDITIONS | 2014 |
|
RU2582428C2 |
METHOD OF MULTI-PARAMETER CONTROL OF BUILDING STRUCTURES (TRANSPORT TUNNELS, BUILDINGS, STRUCTURES) | 2011 |
|
RU2467318C1 |
SYSTEM FOR PASSIVE HEAT REMOVAL FROM INTERNAL VOLUME OF PROTECTIVE SHELL | 2014 |
|
RU2595639C2 |
METHOD FOR ADAPTIVE FORECASTING OF RESIDUAL OPERATING LIFE OF COMPLEX OBJECTS, AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2533321C1 |
UNDERWATER NUCLEAR THERMOELECTRIC PLANT | 2014 |
|
RU2568433C1 |
METHOD FOR MONITORING THE TECHNICAL CONDITION OF GAS TRANSPORT FACILITIES BASED ON A GEO-INFORMATION SYSTEM | 2021 |
|
RU2780304C1 |
Authors
Dates
2016-03-20—Published
2014-12-22—Filed