FIELD: mining.
SUBSTANCE: system and method for performing operations on hydraulic fracturing of formation in well shaft, boring underground formation. Method involves receiving integrated data of drilling platform, creation of a model of mechanical properties of geologic environment using integrated data of drilling platform, simulation of intersection of natural fracture artificially created hydraulic break, using model of mechanical properties of geologic environment, determining properties of intersections encountered natural fractures. Method may also generate a stimulation plan, using model of mechanical properties of geologic environment and properties of intersections. Stimulation plan may include viscosity or consumption of fracture medium.
EFFECT: technical result is improved efficiency of subsurface stimulation.
23 cl, 22 dwg
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION SIMULATION METHOD AND SYSTEM | 2012 |
|
RU2567067C1 |
METHOD OF TYING GEOMETRY OF HYDRAULIC FRACTURING TO MICROSEISMIC EVENTS | 2013 |
|
RU2602858C1 |
SYSTEM AND METHOD FOR PERFORMING WELL OPERATIONS WITH HYDRAULIC FRACTURE | 2012 |
|
RU2634677C2 |
METHOD FOR CHECKING FRACTURE GEOMETRY FOR MICROSEISMIC EVENTS | 2014 |
|
RU2637255C2 |
METHODS OF CONTROLLING OPERATION OF PERFORATORS SYSTEM IN BOREHOLE, UNDERGROUND BED FISSURING AND PROCESSING | 2009 |
|
RU2467160C2 |
METHODS OF MINIMIZING EXCESSIVE EXTENSION OF PROPPING AGENT UNDER HYDRAULIC FRACTURING TREATMENT | 2014 |
|
RU2666566C2 |
METHOD FOR ANALYSIS AND DESIGN OF STIMULATION OF AN UNDERGROUND FORMATION | 2017 |
|
RU2739287C1 |
SYSTEM AND METHOD OF WELL PRODUCTION INTENSIFICATION | 2011 |
|
RU2561114C2 |
SYSTEM AND METHOD OF WELL PRODUCTION INTENSIFICATION | 2011 |
|
RU2569116C2 |
DETERMINING CONFIDENCE VALUE FOR PLANE OF CRACK DEVELOPMENT | 2013 |
|
RU2602760C1 |
Authors
Dates
2016-07-20—Published
2013-08-23—Filed