FIELD: oil and gas industry.
SUBSTANCE: method has stages when: injection and monitoring production wells are selected. Conditions are determined of substances used as indicators of filtration flows. The required volume of a tracer fluid and indicator quantity are determined. The tracer fluid, i.e. water or a water solution of chemical with a stable or radioactive indicator is injected in the injection well. The well is started, from the wellhead of control production wells produced water samples are periodically taken, and physical and chemical analysis for the indicators content is performed. The data are interpreted: upon identification in the produced product of tracers the conclusion is made on the presence of the well watering, behind-the-casing flows, damage of the string tightness. By the comparison of the indicator relative output with the relative liquid output from the production well the well watering due to a foreign source is determined: behind-the-casing flows, damage of the string tightness, from another adjacent injection well, where the indicator is not injected. Wherein the relative output of liquid QLi is the ratio of the total volume of liquid produced from i-th production well during the study period to the total quantity of water injected in the reservoir during the same time period. The relative output of the indicator MOTi is the ratio of the total weight of the indicator taken from the given well during the study period to the input weight of the indicator Mo injected in the reservoir. If QLi/MOTi>1 then water enters the well from a foreign source.
EFFECT: increased accuracy of the determination of reasons of produced water high content in the produced product as per wells with an absent settling well.
22 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF WATER-ENCROACHED OIL POOLS WITH ZONAL NONUNIFORM AND DIFFERENT IN PERMEABILITY FORMATIONS | 2001 |
|
RU2208139C1 |
METHOD OF DEVELOPMENT OF NONUNIFORM ZONE OIL DEPOSIT | 2001 |
|
RU2206727C1 |
METHOD OF DEVELOPMENT OF MULTIHORIZON OIL FIELD | 2002 |
|
RU2211309C1 |
METHOD OF DEVELOPMENT OF OIL MULTILAYER DEPOSIT | 2019 |
|
RU2726664C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSITS | 2008 |
|
RU2383722C2 |
CONTROL METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 2011 |
|
RU2482272C2 |
METHOD OF DETECTING WELLS FLOODED BY BEHIND-THE-CASING FLOWS | 2020 |
|
RU2724730C1 |
METHOD FOR INCREASING THE INFORMATIVE VALUE OF TRACER SURVEYS IN PETROLEUM AND GAS DEPOSITS | 2021 |
|
RU2776786C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2494236C1 |
PROCEDURE FOR ELIMINATION OF CROSS-FEEDS | 2010 |
|
RU2413840C1 |
Authors
Dates
2016-03-20—Published
2014-11-17—Filed