FIELD: energy.
SUBSTANCE: in the known device the backup power line, comprising a steel intermediate support, traverses a hung them with garlands hanging insulators and conductors phase and switching switches are invited back stage to perform a split into three components conductor combined in emergency mode switching switches and connected instead of the faulty phase . In normal operation, the circuit overhead line digested his backup phase switching switches attached symmetrically to the phases of the working circuit overhead line, providing the nominal voltage on the line. In normal mode, attached symmetrically to the phases of the working circuit overhead line split phase increases by 60% the capacity of the working circuit transmission line.
EFFECT: deskew phase voltage operation circuit overhead line (VL).
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SUSPENSION OF FOUR-PHASE LINE WIRES | 2020 |
|
RU2749192C1 |
METHOD OF TRANSFERRING DOUBLE-CIRCUIT AERIAL POWER LINE TO A HIGHER VOLTAGE | 0 |
|
SU1330686A1 |
SINGLE-CIRCUIT POWER SUPPLY LINE OF HIGH OR ULTRAHIGH VOLTAGE | 2021 |
|
RU2765656C1 |
HIGH-VOLTAGE NETWORK AND ITS ANTI-ICE PROTECTION | 2013 |
|
RU2547272C2 |
METHOD OF WIRES SUSPENSION OF FOUR-PHASE LINE | 2020 |
|
RU2756442C1 |
DISCONNECTING FACILITY FOR CONNECTING TRANSFORMER SUBSTATION TO OVERHEAD POWER LINE | 0 |
|
SU1599920A1 |
DEVICE FOR ISOLATING ELECTRIC BRANCH CIRCUIT OF THREE-PHASE POWER TRANSMISSION LINE | 1992 |
|
RU2027270C1 |
ALTERNATING-CURRENT POWER TRANSMISSION | 0 |
|
SU566288A1 |
DEVICE FOR MELTING GLAZE ICE | 0 |
|
SU993370A1 |
METHOD OF DETERMINING PHASE VOLTAGE, SURFACE RESISTANCE AND LEAK CURRENT FOR LINEAR SUSPENDED INSULATOR OF OVERHEAD TRANSMISSION LINE AND DEVICE THEREFOR | 2014 |
|
RU2578726C1 |
Authors
Dates
2016-03-20—Published
2014-12-17—Filed