FIELD: construction.
SUBSTANCE: invention relates to dismountable bridges. Universal dismountable automobile bridge (UARM) includes spans, intermediate supports, coastal supports, entrances on bridge, set of guy amplification of span (pylon bearing shoe, guys, tensioning device), set of pavement, spans with riding on are made of assembly units, including assembly semi-box from bent solid walls beams with open top belt, plate roadway in form of metal orthotropic plate to be fitted at different height, pavements and barrier protection. Mounting joints superstructures implemented by high-strength bolts and two-sided butt straps, connection of assembly units is carried out along lower zone semi-box walls and bottom belts, set of pavement is double-sided.
EFFECT: proposed structure of universal road dismountable bridge.
7 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METAL GUY-ROPE BRIDGE | 0 |
|
SU1513071A1 |
REMOVAL METHOD OF BRIDGE SUPERSTRUCTURE USING CABLE-SUPPORTED SYSTEM | 2013 |
|
RU2534557C1 |
COLLAPSIBLE UNIVERSAL BRIDGE | 2014 |
|
RU2578231C1 |
METHOD TO ERECT BASE PIER SECTION OF CABLE TRUSS BRIDGE SPAN CABLE-STAYED GIRDER AND PILOT BEAM TO REALISE THIS METHOD | 2011 |
|
RU2460838C1 |
STAY-TYPE BRIDGE | 1997 |
|
RU2133791C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT | 1999 |
|
RU2152477C1 |
MOBILE SPAN OF BRIDGE AND METHOD FOR ITS TRANSPORTATION AND ASSEMBLY | 2012 |
|
RU2509186C2 |
BRANCHED PEDESTRIAN BRIDGE | 2009 |
|
RU2407849C1 |
Authors
Dates
2016-04-10—Published
2014-11-10—Filed