FIELD: metallurgy.
SUBSTANCE: invention relates to the field of metallurgy. In order to ensure service life and endurance under-rail areas with a heavy crane girders 8K, 7K mode of operation of overhead cranes during intensive operation produced continuously-cast billets in the portal section of steel 35GS, it is cooled to a temperature of 950÷1050 °C, for roller tables progressively transported it into the rolling mill, fully crimped its rolling mill rolls from four sides and plastically deform the cross section of the portal to the project size with a total reduction ratio of not less than 7.8 to form a mirrored pair of Z-profiles single, monolithic Portal profile with one head and a pair of heels, and the sectional area of the head and a pair of heels are equal to each other, cut finished steel to length and installation of portal rail to the upper belt crane girders couple toe rail and the upper belt crane girders mechanized combined into a single unit friction stud, with a guarantee of tightening the nuts wrench, form a single closed gantry rail with a longitudinal cavity inside, which has increased inertia in torsion
EFFECT: ensuring guaranteed service life and endurance of under-rail areas with a heavy crane girders 8K, 7K mode of operation of overhead cranes during heavy use.
2 dwg, 4 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROTECTION AGAINST COLLAPSE OF CRANE AND EAVES GIRDERS | 2017 |
|
RU2674736C2 |
METHOD OF RAIL PRODUCTION | 2013 |
|
RU2569624C2 |
METHOD OF FORMATION OF RAIL UNIT FROM ARCHED RAILS WITH HEAD IN ARCH KEY | 2015 |
|
RU2624478C2 |
METHOD TO FORM COMPOSITE SHOCK-ABSORBING RAIL | 2013 |
|
RU2552584C2 |
HIGH-RESOURCE PORTAL TWO-WALL CRANE BEAM | 2016 |
|
RU2677375C1 |
METHOD OF INCREASING CRANE GIRDER RESISTANCE WITH TRAVELER WHEELS DYNAMIC EFFECTS | 2011 |
|
RU2486127C2 |
METHOD OF REDUCING THE SERVICE LIFE OF THE EMERGENCY RUNWAY BEAMS | 2014 |
|
RU2583116C2 |
METHOD FOR ELIMINATION OF FATIGUE CRACKS OCCURRENCE POSSIBILITY IN CONNECTION OF RAIL WITH CRANE RUNWAY DOUBLE-T BEAM | 2009 |
|
RU2463240C2 |
REHABILITATION METHOD OF WELDING CRANE BEAM DAMAGED WITH FATIGUE CRACKS | 2009 |
|
RU2460621C2 |
RAIL-AND-BEAM UNIT FOR PARALLEL RAIL TRACKS | 2005 |
|
RU2288886C2 |
Authors
Dates
2016-05-10—Published
2014-03-11—Filed