FIELD: construction.
SUBSTANCE: invention relates to production of construction materials, particularly, to the anchor for insulation material. Composite anchor for insulation material includes anchor part which in the area of its front end has a docking area for fixation in the drilled hole and in the area of its opposite rear end of radially projecting collar and retaining part to hold sheet insulation material anchor for the insulation material, besides, it has through channel for installation at the place of anchor part, on the rear end of holding part it comprises a guiding hole for introduction of anchor and located on anchor part of the collar into the through channel; and in the area of its front end of retaining part opposite to the rear end of retaining part it comprises thrust element inserted into through channel of collar anchor part. Besides, the retaining part has at least locking latch to stop axial movement of the collar anchor part in direction from thrust element which radially protrudes in the through channel.
EFFECT: technical result of invention consists in the fact that composite anchor for insulation material is characterized with high reliability and cost efficiency.
8 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
TRANSIENT STRUCTURE COVERING STRUCTURAL JUNCTION | 2017 |
|
RU2725438C2 |
SPACER ANCHOR WITH THRUST WALLS FOR SLEEVE | 2018 |
|
RU2781121C2 |
ANCHOR SYSTEM FOR CONCRETE WALL CURB | 2008 |
|
RU2409730C1 |
SPACER ANCHOR | 2013 |
|
RU2586830C1 |
ANCHOR BOLT AND METHOD OF MAKING SAME | 2012 |
|
RU2587395C2 |
DEVICE FOR SPINAL STABILISATION, METHOD AND KIT FOR IMPLANTATION THEREOF | 2010 |
|
RU2535775C2 |
SPACER ANCHOR FOR SECURING ON BUILDING TILE-TYPE MATERIAL | 2001 |
|
RU2231692C1 |
DOWEL AND METHOD OF INSTALLATION FOR FIXING INSULATING MATERIALS | 2015 |
|
RU2666935C2 |
RAIL FASTENING ASSEMBLY WITH HALF-HAMMER | 2019 |
|
RU2718528C1 |
ANCHOR AND NUT FOR IT | 2008 |
|
RU2427731C2 |
Authors
Dates
2016-05-20—Published
2014-12-30—Filed