METHOD OF FORMATION TESTING IN MANAGED PRESSURE DRILLING (OPTIONAL) Russian patent published in 2016 - IPC E21B47/06 

Abstract RU 2585780 C2

FIELD: mining.

SUBSTANCE: invention relates to a formation testing in managed pressure drilling. A method of testing an earth formation can include incrementally opening a choke while drilling into the formation is ceased, thereby reducing pressure in a wellbore, and detecting an influx into the wellbore due to the reducing pressure in the wellbore. Another method of testing an earth formation can include drilling into the formation, with an annulus between a drill string and a wellbore being pressure isolated from atmosphere, then incrementally opening a choke while drilling is ceased, thereby reducing pressure in the wellbore, detecting an influx into the wellbore due to the reducing pressure in the wellbore, and determining approximate formation pore pressure as pressure in the wellbore when the influx is detected. Drilling fluid may or may not flow through the drill string when the influx is detected. A downhole pressure sensor can be used to verify pressure in the wellbore.

EFFECT: technical result is an increase in the efficiency of formation testing.

28 cl, 4 dwg

Similar patents RU2585780C2

Title Year Author Number
METHOD AND SYSTEM FOR DRILLING WELLS WITH AUTOMATIC RESPONSE TO DETECTED EVENTS 2011
  • Devis Nensi
  • Batler Kodi
  • Pul Charlz M.
  • Khord Rajan
  • Rejnolds Aaron
  • Godfri Krejg V.
  • Urias Frenk
  • Said Saad
  • Bakri Emad
  • Lovorn Dzhejms R.
RU2586363C2
USING RESULTS OF MEASURING PRESSURE IN WELLBORE DURING DRILLING FOR DETECTION INFLOWS AND FOR REDUCTION THEREOF 2012
  • Lovorn Dzhejms R.
RU2592583C2
DOWNHOLE PRESSURE CONTROL METHOD AT PRESSURE-OPTIMISED DRILLING 2011
  • Bernard Kristofer Dzh.
RU2577345C2
PRESSURE CONTROL DURING DRILLING OPERATIONS WITH THE HELP OF CORRECTION USED IN PRESET CONDITIONS 2012
  • Lovorn Dzhejms R.
  • Devis Nensi S.
  • Batler Kodi N.
RU2598661C2
DRILLING WITH PRESSURE OPTIMISATION BY CONTINUOUS DRILLING STRING OF LIFTING PIPES 2011
  • Majda Dzhon L. Ml.
  • Skinner Nil Dzh.
RU2565299C2
ADVANCED CHANGE OF PRESET PRESSURE TO DISCHARGE FLOW DURING DRILLING OPERATIONS 2011
  • Lovorn Dzhejms R.
  • Devis Nensi S.
RU2586148C2
DEVICE AND METHOD FOR DYNAMIC PRESSURE CONTROL IN ANNULAR SPACE 2003
  • Van Rit Ehgbert Jan
RU2301319C2
HYDRAULIC FRACTURING METHOD OF UNDERGROUND FORMATIONS DURING THEIR DRILLING 2008
  • Dzhonson Ehshli
  • Dzheffrajs Bendzhamin P.
  • Braun Dzh. Ehrnest
RU2502866C2
METHOD FOR SETTING OPERATION OF THROTTLE IN DRILLING SYSTEM WITH ADJUSTABLE PRESSURE 2021
  • Van Kejlenburg, Robert
RU2807455C1
METHOD AND DEVICE FOR DRILLING AND COMPLETION AT PROGRAMMED PRESSURE AND PROGRAMMED PRESSURE GRADIENT 2008
  • Daunton Dzheffri K.
  • Kkhan Vagar
RU2455453C2

RU 2 585 780 C2

Authors

Dzheffris Styuart M.

Dates

2016-06-10Published

2011-07-12Filed