FIELD: mining.
SUBSTANCE: invention relates to a formation testing in managed pressure drilling. A method of testing an earth formation can include incrementally opening a choke while drilling into the formation is ceased, thereby reducing pressure in a wellbore, and detecting an influx into the wellbore due to the reducing pressure in the wellbore. Another method of testing an earth formation can include drilling into the formation, with an annulus between a drill string and a wellbore being pressure isolated from atmosphere, then incrementally opening a choke while drilling is ceased, thereby reducing pressure in the wellbore, detecting an influx into the wellbore due to the reducing pressure in the wellbore, and determining approximate formation pore pressure as pressure in the wellbore when the influx is detected. Drilling fluid may or may not flow through the drill string when the influx is detected. A downhole pressure sensor can be used to verify pressure in the wellbore.
EFFECT: technical result is an increase in the efficiency of formation testing.
28 cl, 4 dwg
Authors
Dates
2016-06-10—Published
2011-07-12—Filed