FIELD: machine building.
SUBSTANCE: invention relates to high-speed railway transport and is intended to ensure overcoming by transport of water obstacles like rivers, lakes or sea straits via a bottom tunnel. According to the suggested method of overcoming by transport of water obstacles, it is necessary to ensure an eight operation of electric trains in a bottom rectangular tunnel of prefabricated reinforced concrete elements at a speed of 300 km/h. There is foreseen simultaneous movement in every direction of several trains at a safe distance. Trains are protected against terrorists attacks by reinforced concrete structures of the tunnel, high-speed movement of trains in the tunnel and pre-entraining inspection of cars, passengers and their luggage. In contrast to passenger and freight long-distance trains long-distance, cargo-passenger trains ply only from one shore of a water obstacle to another one and vice versa, carrying various cars and their passengers. Tunnel, in fact, is a fast and safe transport conveyor across a water obstacle acting according to logistics laws.
EFFECT: as a result, there is achieved fast and safe crossing of a water obstacle by a railway transport.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TRANSPORT OVERCOMING OF WATER OBSTACLE IN AREAS OF ETERNAL CONGELATION | 2016 |
|
RU2641810C2 |
METHOD OF SUPER-HIGH-SPEED IN-MEGAPOLIS PASSENGER AND FREIGHT CONVEYANCE OF HIGHER ANTI-TERRORISM SECURITY | 2009 |
|
RU2503560C2 |
CARGO-AND-PASSENGER SUSPENDED WAY | 2011 |
|
RU2478503C1 |
TRANSPORT JUNCTION AND METHOD FOR CONSTRUCTION THEREOF | 2015 |
|
RU2587673C1 |
SYSTEM FOR RAILWAY TRANSPORT WITH ROTARY CARGO PLATFORM | 2013 |
|
RU2585675C2 |
HIGH SPEED METRO | 2021 |
|
RU2752036C1 |
TUG-TYPE HYBRID TRANSPORT SYSTEM | 2014 |
|
RU2566455C1 |
METHOD FOR BUILDING TUNNEL BRIDGE IN UNDERWATER CHANNEL FOR OVERCOMING SHALLOW OBSTACLES | 2015 |
|
RU2576692C1 |
METHOD FOR CONSTRUCTION OF METRO LINE USING TRENCHLESS METHOD WITH PERMANENT CROSS-SECTION CASING AND SINGLE TYPE OF TUNNEL-PENETRATING MECHANIZED COMPLEX | 2020 |
|
RU2754694C1 |
METHOD OF CONSTRUCTING SUBWAY PYLON STATION USING CLOSED METHOD OF PERFORMING WORKS ON OPERATING SUBWAY LINE WITHOUT INTERRUPTING TRAIN TRAFFIC | 2023 |
|
RU2824544C1 |
Authors
Dates
2016-06-10—Published
2014-10-07—Filed