WELL COMPLETION METHOD Russian patent published in 2015 - IPC E21B43/27 

Abstract RU 2541986 C1

FIELD: oil and gas industry.

SUBSTANCE: well completion method includes the injection of an acid solution by circulation with the wellhead by means of a jet nozzle placed at the end of a flexible flush-joint pipe, simultaneously with the acid solution circulation lifting of the flexible flush-joint pipe with a rate that does not exceed the rate of the borehole filling with the acid solution, upon filling of a horizontal borehole with the acid solution flushing of the acid solution to the formation with the staged pressure increase and the process withhold at each stage for the purpose of acid reaction with rock, injection of inert gas, recording of the level recovery curve, well killing and well development. A tubing string with starting clutches and with a funnel on the end is lowered into the well preliminarily at the interval of the shoe of the production casing. The flexible flush-joint pipe with the jet nozzle is lowered inside the tubing. Before the acid is flushed to the formation, the horizontal shaft of the well at an open annular space is filled through the flexible flush-joint pipe with a water solution of a surface active substance (SAS). At the closed annular space the water solution of the surface active substance is flushed to the formation, the process is withheld till oil flowing to the well. Then through the annular space the acid solution is flushed, the process is withheld for the purpose of the acid reaction with the rock, the borehole is washed, the flexible flush-joint pipe with the jet nozzle is lifted from the well. Inert gas injection is made through the annular space with the fluid sampling in the tubing string. Upon development of the well a geophysical survey is made for the horizontal borehole at the flexible pipe by thermometry and measurement by a flowmeter. Upon receipt of the survey results non-operated intervals are identified and by comparing geophysical data with final logging data non-operated intervals are identified in the horizontal borehole having high permeability and porosity. By running the flexible flush-joint pipe in, the jet nozzle is set in these intervals of the horizontal borehole, the jet nozzle end is thrusted to the horizontal borehole wall and the acid solution is circulated through the flexible flush-joint pipe, jet nozzle and tubing string until depression (channel) is formed in the rock and the surface area of the impact interval is increased. Then through the annular space the acid solution is flushed, the process is withheld for the purpose of the acid reaction with the rock, the borehole is washed, the flexible flush-joint pipe with the jet nozzle is lifted from the well. Inert gas injection is made through the annular space with the fluid sampling in the tubing string.

EFFECT: improving the acid treatment efficiency.

1 ex

Similar patents RU2541986C1

Title Year Author Number
WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION, LOCATED IN ISOLATION FROM WATER-BEARING FORMATION 2015
  • Khisamov Rais Salikhovich
  • Gumarov Nafis Faritovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustyamovich
RU2593281C1
HORIZONTAL WELL COMPLETION METHOD 2015
  • Ibragimov Nail Gabdulbarievich
  • Sagatov Ramis Fanisovich
  • Aslyamov Ajrat Ingelevich
  • Garaev Rafael Rasimovich
  • Absalyamov Ruslan Shamilevich
RU2588108C1
WELL COMPLETION METHOD 2014
  • Khisamov Rais Salikhovich
  • Rakhmanov Ajrat Rafkatovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
RU2541988C1
WELL COMPLETION METHOD, EXPOSING PRODUCTIVE FORMATION LOCATED NEAR WATER-SATURATED FORMATION 2015
  • Khisamov Rais Salikhovich
  • Gumarov Nafis Faritovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
RU2579069C1
METHOD FOR WELL COMPLETION 2012
  • Ibragimov Nail' Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Minnullin Rashit Mardanovich
  • Faskhutdinov Ruslan Rustjamovich
  • Garaev Rafaehl' Rasimovich
RU2490442C1
METHOD FOR DEVELOPMENT OF MULTI-HOLE BRANCHED HORIZONTAL WELL 2014
  • Fajzullin Ilfat Nagimovich
  • Nabiullin Rustem Fakhrasovich
  • Gusmanov Ajnur Rafkatovich
  • Gubaev Rim Salikhovich
  • Sadykov Rustem Ildarovich
RU2581589C1
WELL BOTTOMHOLE ZONE TREATMENT METHOD 2015
  • Kazantsev Sergej Andreevich
  • Skvortsov Dmitrij Evgenevich
  • Glebov Vadim Igorevich
RU2601960C1
METHOD OF DRILLING AND DEVELOPMENT OF OFFSHOOT FROM HORIZONTAL WELL (VERSIONS) 2019
  • Makhmutov Ilgizar Khasimovich
  • Ziyatdinov Radik Zyauzyatovich
RU2709262C1
ACID TREATMENT METHOD OF OPEN HORIZONTAL SHAFT OF WELLS 2020
  • Nasibulin Ilshat Maratovich
  • Asadullin Marat Fagimovich
  • Petrov Mikhail Aleksandrovich
  • Khasanova Natalya Anatolevna
RU2740505C1
PROCESSING METHOD OF CARBONATE OIL RESERVOIR 2016
  • Akhmetgareev Vadim Valerevich
  • Khisamov Rais Salikhovich
  • Nugajbekov Renat Ardinatovich
  • Makhleev Fedor Fedorovich
RU2614840C1

RU 2 541 986 C1

Authors

Khisamov Rais Salikhovich

Gumarov Nafis Faritovich

Minnullin Rashit Mardanovich

Musabirov Munavir Khadeevich

Akhmetshin Rubin Mudarisovich

Faskhutdinov Ruslan Rustjamovich

Dates

2015-02-20Published

2014-04-28Filed