FIELD: mining.
SUBSTANCE: invention relates to optimization of hydrocarbon production and can be used in simulating of developed deposit. Disclosed is method of solving optimization task. Method includes creation of initial model with multitude of wells, each well is connected with certain parameter, and separation of this group of wells to first and second areas. First area includes first subset of multiple wells, and second area includes second subset of this multitude of wells. Method also includes calculation of parameters related to wells in first subset, to obtain first set of values while maintaining constant parameters related to wells in second subset, installation of parameters related to wells in first subset from first set of values and calculating parameters related to wells in second subset, to obtain second set of values, while maintaining constant parameters related to wells in first subset. Obtained data are used for selection of location and trajectory for multiple real boreholes in collector bed.
EFFECT: optimised production of hydrocarbons.
24 cl, 12 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM AND TOOL FOR IMPROVING PREDICTION ACCURACY OF MATURE DEPOSITS MODEL | 2018 |
|
RU2718042C2 |
BOREHOLE PLANNING USING A GEOMECHANICAL SHIFT | 2020 |
|
RU2779040C1 |
MULTISTAGE OIL FIELD DESIGN OPTIMISATION UNDER UNCERTAINTY | 2015 |
|
RU2669948C2 |
DEVICE, METHOD AND SYSTEM OF STOCHASTIC INVESTIGATION OF FORMATION AT OIL-FIELD OPERATIONS | 2008 |
|
RU2496972C2 |
GENERATION OF SEQUENCE OF OPERATIONS BY COMPLEX ANALYSIS ON BASIS OF SINGLE WELL PREDICTIVE MODE-MODULAR DYNAMIC TESTER (SWPM-MDT) | 2005 |
|
RU2336567C1 |
SYSTEM AND METHOD FOR RESERVOIR SIMULATION USING REQUESTED DATA | 2012 |
|
RU2577256C1 |
METHOD AND TOOL FOR THE SELECTION OF OPERATING PARAMETERS OF WELLS AT THE MATURE OIL FIELDS FLOODING STAGE | 2017 |
|
RU2681778C2 |
METHODS AND SYSTEMS FOR CONTROLLING NEGATIVE MOBILITY OF COMPONENTS IN RESERVOIR SIMULATION | 2013 |
|
RU2590278C1 |
SYSTEM FOR THE SELECTION OF THE ADAPTATION OF THE DRILLING PLAN OF THE BONE OF WELLS AT THE STAGE OF MPD UNDER CONDITIONS OF UNCERTAINTY | 2017 |
|
RU2692379C2 |
SYSTEM AND METHOD FOR PERFORMING OPERATIONS FOR STIMULATION OF RESOURCES | 2013 |
|
RU2591857C1 |
Authors
Dates
2016-08-10—Published
2012-05-30—Filed