FIELD: energy.
SUBSTANCE: disclosed is method of wind-driven power plant or wind farm and power into gas conversion unit electrically connected with them, where wind-driven power plant or wind park generates electric power and delivers it to electrical network connected to wind power plant or to wind park. Each wind-driven power plant operates with preset power curve. Electric power is generated by windmill or wind farm when first wind velocity is achieved. Wind-driven power plant or wind park are in partial load mode until wind velocity is in between first wind speed and second wind speed. Wind-driven power plant or wind park are in range of nominal power if wind speed is in range, which is more than second wind velocity. Thus, electric power generated by wind-driven power plant or wind farm, consumed by power into gas conversion unit, so that in power into gas conversion unit combustible gas is created. Part of electric power, which is generated by wind-driven power plant or wind park in partial load mode and which is not consumed by power in gas conversion unit, is set as almost constant for given period of time. Data processing device is executed in connected with windmill or wind farm or with wind-driven power plant or wind farm, wherein data processing device is processing data for prediction of wind, relating to specified period of time, based on data for prediction of wind forecast power value is determined, which windmill or wind park generates during prediction period reliably or with high degree of reliability.
EFFECT: invention is aimed at achievement of constant accumulation and output to mains of electric power by wind-driven power plant.
10 cl, 5 dwg
Authors
Dates
2016-09-10—Published
2012-12-10—Filed