FIELD: construction.
SUBSTANCE: invention relates to construction and can be used in designs of pile-plate foundations, intended for construction of buildings and structures. Foundation consists of base plate and piles, arranged outside the base plate and connected with flexible links, located above or below of the ground level. Flexible links are made of prestressed metal cables. Piles are composed of bored piles with cores from metal thick-walled pipes, to external cylindrical surface of each of which are rigidly attached on opposite sides two lengthwise metal plates, located in the plane passing through the longitudinal axis of the pipe and perpendicular to direction of link.
EFFECT: technical result consists in improvement of reliability and bearing capacity of foundation, reduction of material consumption of its construction.
8 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDING FOUNDATION FOR RESERVOIR | 2002 |
|
RU2209884C1 |
PILE, AND ITS ERECTION METHOD | 2013 |
|
RU2538012C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
PILE AND ITS ERECTION METHOD | 2013 |
|
RU2535556C1 |
REINFORCED CONCRETE DRILLING PILE AND METHOD OF ITS ERECTION | 2016 |
|
RU2657885C2 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD OF CONSTRUCTING DEEP FOUNDATIONS AND DEEP FOUNDATION | 2017 |
|
RU2698783C2 |
BORED PILE REINFORCEMENT METHOD | 2020 |
|
RU2737303C1 |
FOUNDATION | 2006 |
|
RU2320820C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
Authors
Dates
2016-10-10—Published
2015-09-21—Filed