FIELD: mining.
SUBSTANCE: invention relates to handling equipment, used in mining industry and production of construction materials. Loading of loose materials in ship holds includes reception of loose material in loading chute from tired vehicles, and loading chute is moved by means of kinematic links with power cylinders. Power cylinders provide loading chute turning in vertical plane, and loading of loose material in ship hold is periodically displaced by drive truck with loading chute on rails along whole length of loading front, equal to total length of ship holds. Truck is equipped with additional loading chute and kinematic links of both loading chutes with power cylinders through L-like levers. Drive is made in form of independent power plant, and power plant is located on truck. Synchronization of power cylinders is made automatically via control unit, which are mounted on truck and loading chutes. Loading chutes are made in form of reservoir, equal to capacity of tired vehicle, with V-shaped bottom.
EFFECT: increased efficiency and safety of works, increased reliability are achieved.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR LOADING LOOSE CARGO INTO SHIP'S HOLD | 2004 |
|
RU2268225C1 |
DEVICE TO LOAD LOOSE CARGOES INTO FREIGHT SHIP HOLDS | 2007 |
|
RU2329937C1 |
0 |
|
SU20008A1 | |
CARGO TRANSPORTER LOADING ASSEMBLY | 2014 |
|
RU2662104C2 |
SHIP OFFSHORE LOADING AND UNLOADING DEVICE | 2005 |
|
RU2381167C2 |
DEVICE FOR CONTINUOUS UNLOADING OF LOOSE MATERIAL FROM SHIPS OF OTHER CONTAINERS | 1996 |
|
RU2136571C1 |
0 |
|
SU137054A1 | |
DEVICE TO RELOAD LOADS FROM DUMP TRUCKS INTO OPEN WAGONS | 2007 |
|
RU2332349C1 |
DEVICE FOR ERECTING EMBANKMENT | 0 |
|
SU1523501A1 |
CRANE INSTALLATION WITH CONTINUOUS-ACTION TRANSPORTATION SYSTEM FOR TRANSPORTATION OF UNIT LOADS | 1990 |
|
RU2041854C1 |
Authors
Dates
2016-11-20—Published
2015-07-21—Filed