FIELD: cargo handling facilities; devices for loading loose cargo from pneumatic-tire transport facilities directly into ship's hold.
SUBSTANCE: overpass with pavement is mounted above berth along its quay and loading chute is mounted on trolley for its motion under overpass along entire length of loading front. Loading chute is articulated by its end directed to overpass on free end of rectangular flat frame whose second lower end is articulated on trolley on side of quay for turning of frame in vertical plane. In working position loading chute is located at spaced relation between adjacent columns of overpass on side of quay; in non-operating position it is located at spaced relation between two rows of columns of overpass and its pavement; trolley is mounted for motion over rail track. Border stone of pavement is provided with inclined baffle plate on side of quay for receiving loose cargo from pneumatic-tire transport facility.
EFFECT: increased productivity; reduced power requirements in loading heavy-freight ships.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE TO LOAD LOOSE CARGOES INTO FREIGHT SHIP HOLDS | 2007 |
|
RU2329937C1 |
METHOD OF LOADING OF LOOSE MATERIALS IN SHIP HOLDS | 2015 |
|
RU2602519C1 |
DEVICE TO RELOAD LOADS FROM DUMP TRUCKS INTO OPEN WAGONS | 2007 |
|
RU2332349C1 |
SHIP OFFSHORE LOADING AND UNLOADING DEVICE | 2005 |
|
RU2381167C2 |
DEVICE FOR LOADING/UNLODING AND TRANSPORTATION OF HEAVY CARGO ON LIGHTER-VESSEL | 2001 |
|
RU2207288C2 |
CLOSED COAL TRANSFER SYSTEM AND METHOD OF ITS OPERATION | 2020 |
|
RU2733677C1 |
SYSTEM FOR TRANSFERRING FREIGHT OVER DAM | 0 |
|
SU1754603A1 |
0 |
|
SU20008A1 | |
CARGO TRANSPORTER LOADING ASSEMBLY | 2014 |
|
RU2662104C2 |
TRAFFIC SYSTEM | 2013 |
|
RU2557099C2 |
Authors
Dates
2006-01-20—Published
2004-07-22—Filed